
9365200990 Rev F
BE1-CDS240 Testing and Maintenance
i
SECTION 13
TESTING AND MAINTENANCE
TABLE OF CONTENTS
Acceptance Testing.......................................................................................................................... 13-1
Commissioning Testing .................................................................................................................... 13-1
Periodic Testing................................................................................................................................ 13-1
Functional Testing ............................................................................................................................ 13-2
Performance Testing ........................................................................................................................ 13-2
AIDS....................................................................................... 13-2
Test Setup ........................................................................................................................................ 13-3
Test Equipment ................................................................................................................................ 13-3
Power Up.......................................................................................................................................... 13-5
Communications............................................................................................................................... 13-5
Style Number and Serial Number Verification.................................................................................. 13-6
IRIG Verification ............................................................................................................................... 13-6
Contact Sensing Inputs and Control Outputs................................................................................... 13-6
Current Circuit Verification ............................................................................................................... 13-7
Three-Phase Voltage Circuit Verification ......................................................................................... 13-9
Power Reading Verification ............................................................................................................ 13-10
Protection and Control Function Verification.................................................................................. 13-11
Testing Phase Differential Protection with Internal Compensation ................................................ 13-12
Verify Other Set Points as Appropriate .......................................................................................... 13-22
Digital I/O Connection Verification ................................................................................................. 13-22
Virtual 43 Switches......................................................................................................................... 13-23
Virtual 101 Switches....................................................................................................................... 13-24
Reporting and Alarm Functions...................................................................................................... 13-24
In Service Current Circuit Verification ............................................................................................ 13-26
CLOCK ................................................ 13-31
Phase Differential (87).................................................................................................................... 13-33
Neutral Differential (87ND & 187ND) ............................................................................................. 13-52
Instantaneous Overcurrent (50T) ................................................................................................... 13-57
Time Overcurrent (51) .................................................................................................................... 13-60
Volts per Hertz Overexcitation (24) ................................................................................................ 13-63
Undervoltage (27/127) and Overvoltage (59/159).......................................................................... 13-67
Negative-Sequence Voltage (47) ................................................................................................... 13-68
Over/Underfrequency (81/181/281/381/481/581) .......................................................................... 13-70
Breaker Failure (50BF/150BF/250BF/350BF)................................................................................ 13-71
Virtual Switch Verification (43/143/243/343/443/543/643/743) ...................................................... 13-74
101 Virtual Breaker Control Switch ................................................................................................ 13-77
Logic Timer Verification (62/162/262/362) ..................................................................................... 13-79
Automatic Setting Group Change................................................................................................... 13-86
Содержание BE1-CDS240
Страница 1: ...INSTRUCTION MANUAL FOR CURRENT DIFFERENTIAL SYSTEM BE1 CDS240 Publication 9365200990 Revision F 12 08 ...
Страница 2: ......
Страница 8: ...vi BE1 CDS240 Introduction 9365200990 Rev F This page intentionally left blank ...
Страница 38: ...1 28 BE1 CDS240 General Information 9365200990 Rev F This page intentionally left blank ...
Страница 40: ...ii BE1 CDS240 Quick Start 9365200990 Rev F This page intentionally left blank ...
Страница 74: ...3 22 BE1 CDS240 Input and Output Functions 9365200990 Rev F This page intentionally left blank ...
Страница 152: ...ii BE1 CDS240 Metering 9365200990 Rev F This page intentionally left blank ...
Страница 208: ...ii BE1 CDS240 BESTlogic Programmable Logic 9365200990 Rev F This page intentionally left blank ...
Страница 210: ...Figure 7 1 BESTlogic Function Blocks page 1 of 5 7 2 BE1 CDS240 BESTlogic Programmable Logic 9365200990 Rev F ...
Страница 211: ...Figure 7 2 BESTlogic Function Blocks page 2 of 5 9365200990 Rev F BE1 CDS240 BESTlogic Programmable Logic 7 3 ...
Страница 212: ...Figure 7 3 BESTlogic Function Blocks page 3 of 5 7 4 BE1 CDS240 BESTlogic Programmable Logic 9365200990 Rev F ...
Страница 213: ...Figure 7 4 BESTlogic Function Blocks page 4 of 5 9365200990 Rev F BE1 CDS240 BESTlogic Programmable Logic 7 5 ...
Страница 214: ...Figure 7 5 BESTlogic Function Blocks page 5 of 5 7 6 BE1 CDS240 BESTlogic Programmable Logic 9365200990 Rev F ...
Страница 222: ...7 14 BE1 CDS240 BESTlogic Programmable Logic 9365200990 Rev F This page intentionally left blank ...
Страница 226: ...iv BE1 CDS240 Application 9365200990 Rev F This page intentionally left blank ...
Страница 238: ...Figure 8 3 Typical One line Diagram for CDS240 BA87 B BE 8 12 BE1 CDS240 Application 9365200990 Rev F ...
Страница 262: ...Figure 8 11 Typical One line Diagram for CDS240 BSBU A BE 8 36 BE1 CDS240 Application 9365200990 Rev F ...
Страница 286: ...ii BE1 CDS240 Security 9365200990 Rev F This page intentionally left blank ...
Страница 290: ...9 4 BE1 CDS240 Security 9365200990 Rev F This page intentionally left blank ...
Страница 292: ...ii BE1 CDS240 Human Machine Interface 9365200990 Rev F This page intentionally left blank ...
Страница 296: ...Figure 10 4 BE1 CDS240 Menu Tree Control Branch 10 4 BE1 CDS240 Human Machine Interface 9365200990 Rev F ...
Страница 298: ...Figure 10 6 BE1 CDS240 Menu Tree Reports Branch 10 6 BE1 CDS240 Human Machine Interface 9365200990 Rev F ...
Страница 300: ...Figure 10 8 BE1 CDS240 Menu Tree Protection Branch 2 of 2 10 8 BE1 CDS240 Human Machine Interface 9365200990 Rev F ...
Страница 301: ... Figure 10 9 BE1 CDS240 Menu Tree General Settings Branch 9365200990 Rev F BE1 CDS240 Human Machine Interface 10 9 ...
Страница 306: ...10 14 BE1 CDS240 Human Machine Interface 9365200990 Rev F This page intentionally left blank ...
Страница 308: ...ii BE1 CDS240 ASCII Command Interface 9365200990 Rev F This page intentionally left blank ...
Страница 342: ...11 34 BE1 CDS240 ASCII Command Interface 9365200990 Rev F This page intentionally left blank ...
Страница 349: ...Figure 12 5 Horizontal Rack Mount Front View 9365200990 Rev F BE1 CDS240 Installation 12 5 ...
Страница 351: ...Figure 12 8 Vertical Panel Mount L size Front View 9365200990 Rev F BE1 CDS240 Installation 12 7 ...
Страница 361: ...Figure 12 17 Typical DC Connection Diagrams 9365200990 Rev F BE1 CDS240 Installation 12 17 ...
Страница 365: ...Figure 12 23 BE1 CDS240 Percentage Differential Bus Protection 9365200990 Rev F BE1 CDS240 Installation 12 21 ...
Страница 372: ...12 28 BE1 CDS240 Installation 9365200990 Rev F This page intentionally left blank ...
Страница 468: ...13 92 BE1 CDS240 Testing and Maintenance 9365200990 Rev F This page intentionally left blank ...
Страница 512: ...14 42 BE1 CDS240 BESTCOMS Software 9365200990 Rev F This page intentionally left blank ...
Страница 514: ...ii BE1 CDS240 Time Overcurrent Characteristic Curves 9365200990 Rev F This page intentionally left blank ...
Страница 538: ...ii BE1 CDS240 Overexcitation 24 Inverse Time Curves 9365200990 Rev F This page intentionally left blank ...
Страница 544: ...ii BE1 CDS240 Terminal Communication 9365200990 Rev F This page intentionally left blank ...
Страница 550: ...ii BE1 CDS240 Settings Calculations 9365200990 Rev F This page intentionally left blank ...
Страница 578: ...D 28 BE1 CDS240 Settings Calculations 9365200990 Rev F This page intentionally left blank ...
Страница 579: ......
Страница 580: ...ROUTE 143 BOX 269 HIGHLAND IL 62249 USA http www basler com info basler com PHONE 1 618 654 2341 FAX 1 618 654 2351 ...