BE1-25/79TR Testing
5-14
Step 7.
Verify that all contact sensing inputs are open. Operate the Status/EDIT Down switch.
Observe that the relay completes the pre-programmed test sequence. The sequence of
events (tests) is as follows:
HSR Target LED ON
LT1 Target LED ON
LT2 Target LED ON
PAR Target LED ON
PF Target LED ON
RP1 Target LED ON
RP2 Target LED ON
LO Target LED ON
LT1 Timing LED ON
LT2 Timing LED ON
RP1 Timing LED ON
RP2 Timing LED ON
PF Timing LED ON
PAR Timing LED ON
LO Timing LED ON
RST Timing LED ON
DB Control LED ON
LB Control LED ON
DL Control LED ON
LL Control LED ON
TRIP Control LED ON
CLOSE Control LED ON
25 Control LED ON
CE Control LED ON
CLOSE contacts close
TRIP contacts close
N.O. PROG 1 contacts close.
N.O. PROG 2 contacts close.
N.O. PROG 3 contacts close.
LT1 contact closes.
LT2 contact closes.
RP1 contact closes.
RP2 contact closes.
Normally closed RT ALM contacts opens.
SYNC contacts close
Allows Step 6 to be performed.
Step 8.
To terminate the test, operate the Reset switch.
Содержание BE1-25/79TR
Страница 1: ...05647 6 10 07 14 19 241 5 0 4 15 0 4 64 Publication 9 2787 00 990 Revision B 07 95...
Страница 23: ...BE1 25 79TR Controls and Indicators 2 3 Figure 2 3 Location of Controls and Indicators Control Panel...
Страница 25: ...BE1 25 79TR Controls and Indicators 2 5 Figure 2 5 Vertical BE1 25 79TR Sync Check Reclosing Relay Front View...
Страница 26: ...BE1 25 79TR Controls and Indicators 2 6 Figure 2 6 Vertical BE1 25 79TR Sync Check Reclosing Relay Rear View...
Страница 27: ...BE1 25 79TR Controls and Indicators 2 7 Figure 2 7 Front Panel Vertical Mount Relay...
Страница 29: ...BE1 25 79TR Functional Description 3 2 Figure 3 1 Functional Block Diagram...
Страница 60: ...BE1 25 79TR Installation 4 8 Figure 4 9 RS 232 Interconnection Diagram For IBM Type Computers...
Страница 61: ...BE1 25 79TR Installation 4 9 Figure 4 10 RS 232 Interconnection Diagram For Protective Relay Terminals...
Страница 63: ...BE1 25 79TR Testing 5 2 REAR VIEW FRONT VIEW Figure 5 1 BE1 25 79TR Test Simulator...
Страница 64: ...BE1 25 79TR Testing 5 3 Figure 5 2 BE1 25 79TR Test Simulator Schematic Diagram Sheet 1 of 2...
Страница 65: ...BE1 25 79TR Testing 5 4 Figure 5 3 BE1 25 79TR Test Simulator Schematic Diagram Sheet 2 of 2...
Страница 66: ...BE1 25 79TR Testing 5 5 Figure 5 4 Test Setup Diagram...