9

If current through the temperature sensor exceeds the values 
listed,  an  intermediate  control  circuit  relay  must  be  used 
to  reduce  the  current  or  the  sensor  will  not  work  properly.

TEMPERATURE SENSOR ELECTRICAL RATINGS

Volts

Continuous

Amperes

Inrush

Amperes

110-120

3.00

30.0

220-240

1.50

15.0

440-480

0.75

7.5

600

0.60

6.0

C-4.2-2)  Single  Phase  (Standard)  - 

The  type  of  in-winding 

overload protector used is referred to as an inherent overheating 
protector and operates on the combined effect of temperature 
and  current.  This  means  that  the  overload  protector  will  trip 
out and shut the pump off if the windings become too hot, or 
the  load  current  passing  through  them  becomes  too  high.  It 
will  then  automatically  reset  and  start  the  pump  up  after  the 
motor cools to a safe temperature. In the event of an overload, 
the source of this condition should be determined and 

rectifi ed 

immediately. 

DO  NOT  LET  THE  PUMP  CYCLE  OR  RUN  IF 

AN OVERLOAD CONDITION OCCURS !

C-4.3) Moisture Sensors- DS Models:  (Optional)

A  normally  open  (N/O)  detector  is  installed  in  the  pump 
seal  chamber  which  will  detect  any  moisture  present.  It  is 
recommended that this detector be connected in series to an 
alarm device or the motor started coil to alert the operator that a 
moisture detect has occurred. In the event of a moisture detect, 
check the individual moisture sensor probe leads for continuity, 

(∞ resistance = no moisture) and the junction box/control box 
for moisture content. The above situations may induce a false 
signal in the moisture detecting circuit.  If none of the above 
tests prove conclusive, the pump(s) should be pulled and the 
source of the failure identifi ed and repaired.  

IF A MOISTURE 

DETECT HAS OCCURRED SCHEDULE MAINTENANCE AS 
SOON AS POSSIBLE.

C-4.4) Wire Size:

Consult a qualifi ed electrician for proper wire size if additional 
power cord length is required. See table on pages 9 and 10 
for electrical information.

SECTION: D START-UP OPERATION

D-1) Check Voltage and Phase:

Before operating pump, compare the voltage and phase 
information stamped on the pump identifi cation plate to the 
available power.

D-2) Check Pump Rotation:

Before putting pump into service for the fi rst time, the motor 
rotation must be checked. Improper motor rotation can 
result in poor pump performance and can damage the motor 
and/or pump. To check the rotation, suspend the pump 
freely, momentarily apply power and observe the “kickback”. 
“Kickback” should always be in a counter-clockwise direction 
as viewed from the top of the pump motor housing.

D-2.1) Incorrect Rotation for Three-Phase Pumps:

In the event that the rotation is incorrect for a three-phase 
installation, interchange any two power cord leads at the 
control box. 

DO NOT

 change leads in the cord housing in the 

motor. Recheck the “kickback” rotation again by momentarily 
applying power.

D-2.2) Incorrect Rotation for Single-Phase Pumps:

In the unlikely event that the rotation is incorrect for a single 
phase pump, contact a Barnes Pumps Service Center.

D-3) Identifi cation Plate:

Record future serial plate information in the “NOTES” section.

D-3.1) Pump-Down Test:

After the pump has been properly wired and lowered into the 
basin, sump or lift station, it is advisable to check the system 
by fi lling with liquid and allowing the pump to operate through 
its  pumping  cycle. The  time  needed  to  empty  the  system,  or 
pump-down  time  along  with  the  volume  of  water,  should  be 
recorded on the start-up report.

SECTION E: PREVENTATIVE MAINTENANCE

As the motor is oil fi lled, no lubrication or other maintenance 
is required, and generally Barnes Pumps will give very reliable 
service and can be expected to operate for years on normal 
sewage  pumping  without  failing.  In  our  experience  attempts 
at preventative maintenance are more likely to reduce, rather 
than extend the life of our pumps. However, if you are inclined 
to  perform  preventative  maintenance,  the  following  are  the 
steps that should be performed.

1)   Inspect motor chamber for oil level and contamination
 

and repair as required per section F-1.

2)  Inspect impeller and body for excessive build-up or
 

clogging and repair as required per section F-2.

3)  Inspect motor and bearings and replace as required 
 

per section F-3.

4)  Inspect seal for wear or leakage and repair as required
 

per section F-4.

Содержание SE51A

Страница 1: ...program product changes may occur As such Crane Pumps Systems reserves the right to change product without prior written notification 420 Third Street 83 West Drive Bramton Piqua Ohio 45356 Ontario C...

Страница 2: ...18 22 SE HT SINGLE SEAL EXPLODED VIEW Fig 19 23 3SE DS DOUBLE SEAL CROSS SECTION Fig 20 24 3SE DS DOUBLE SEAL EXPLODED VIEW Fig 21 25 PARTS LIST 26 28 RETURNED GOODS POLICY 32 WARRANTY 31 WARRANTY RE...

Страница 3: ...rt fingers in pump with power connected Always wear eye protection when working on pumps Make sure lifting handles are securely fastened each time before lifting DO NOT operate pump without safety dev...

Страница 4: ...Filled Reservoir Material Carbon Ceramic Buna N Hardware 300 Series Stainless CORD ENTRY 15 ft 5 m 20 ft 6 1 m Cord Plug on 120 Volt 5HP 240 Volt 1 Phase Quick connect custom molded for sealing and s...

Страница 5: ...le Seal SE A SE HTA Single Seal SE AU SE HTAU Single Seal Plugs for 120 Volt and 5Hp 240 Volt Single Phase Models Plugs for 120 Volt and 5Hp 240 Volt Single Phase Models Plugs for 120 Volt and 5Hp 240...

Страница 6: ...6 Plugs for 120 Volt and 5Hp 240 Volt Single Phase Models inches mm Plugs for 120 Volt and 5Hp 240 Volt Single Phase Models 3SE L Single Seal 3SE DS Double Seal...

Страница 7: ...or basin that is free of hard debris like gravel stones sand or earth The sump lift station or basin shall be vented in accordance with local plumbing codes This pump is designed to pump sewage efflu...

Страница 8: ...rations Automatic Plug float cord into outlet then plug pump cord into float cord Manual Plug pump cord directly int outlet C 4 Electrical Connections C 4 1 Power and Control Cable The cord assembly m...

Страница 9: ...tamped on the pump identi cation plate to the available power D 2 Check Pump Rotation Before putting pump into service for the rst time the motor rotation must be checked Improper motor rotation can r...

Страница 10: ...5 3 14 4 SOW 0 570 14 5 40 80 52 00 3SE554L 0 5 600 3 60 1750 H B 1 0 3 4 14 4 SOW 0 570 14 5 77 60 89 76 3SE774L 0 75 200 240 1 60 1750 G K F 7 4 7 0 21 5 25 8 14 3 SOW 0 530 13 5 1 86 10 20 2 74 10...

Страница 11: ...he pressure does not hold then the leak must be located and repaired Pumps that have NOT had the oil drained from the Motor Housing The pressure test may be done with the oil at its normal level Remov...

Страница 12: ...volute 1 Position lockwasher 12 on cap screw 26 and screw into volute 1 Torque to 100 in lbs Check for free rotation of motor and impeller F 3 Shaft Seal Service CAUTION Handle seal parts with extrem...

Страница 13: ...ing sure it is seated on retainer and not cocked or resting on bellows tail Slide retaining ring 28d over shaft and let rest on spring 28c Replace snap ring 32 in groove of shaft Set square ring 27 in...

Страница 14: ...ce station or Barnes Pumps Service department Inspect motor winding for shorts and check resistance values Check rotor for wear If rotor or the stator windings are defective the complete motor must be...

Страница 15: ...eplacement parts ALWAYS furnish the following information 1 Pump serial number and date code Paragraph G 4 2 Pump model number Paragraph G 3 3 Pump part number Paragraph G 2 4 Part description 5 Item...

Страница 16: ...16 FIGURE 13...

Страница 17: ...17 FIGURE 13...

Страница 18: ...18 FIGURE 13 CONTIUED...

Страница 19: ...cutter for freedom of operation security and condition Clean cutter and inlet of any obstruction 9 Loosen union slightly to allow trapped air to escape Verify that turn off level of switch is set so t...

Страница 20: ...20 FIGURE 16 SE L 3SE L Series Single Seal...

Страница 21: ...21 FIGURE 17 SE L 3SE L Series Single Seal...

Страница 22: ...22 FIGURE 18 SE HT High Temp Series Single Seal...

Страница 23: ...23 FIGURE 19 SE HT High Temp Series Single Seal...

Страница 24: ...24 FIGURE 20 3SE DS Series Double Seal...

Страница 25: ...25 FIGURE 21 3SE DS Series Double Seal...

Страница 26: ...BS 070963 SE774L 3SE774L SE1074L 3SE1074L 029792BD 070963 3SE774DS 3SE1074DS 071354BS None SE794L SE744L 3SE794L 3SE744L SE1094L None SE1044L 3SE1094L 3SE1044L 071354BD None 3SE794DS 3SE744DS 3SE1094D...

Страница 27: ...a 084346TH 5 00 Dia 084346TJ 4 88 Dia 084346TK 4 75 Dia 084346TL 4 63 Dia 084346TM 4 50 Dia 084346TN 4 38 Dia 084346TP 4 25 Dia 084346TQ 4 13 Dia 084346TR 4 00 Dia 36 1 027344 t Gasket 39 1 014270 Pip...

Страница 28: ...ABLE LENGTH ITEM 16 120 VOLT 1 PHASE STD Temp ITEM 16 120 VOLT 1 PHASE High Temp ITEM 16 240 VOLT 1 PHASE 0 5HP STD HT ITEM 16 240 VOLT 1 PHASE 0 75 1HP STD HT ITEM 16 3 PHASE ITEM 55 OPTIONAL STD Tem...

Страница 29: ...29 Notes...

Страница 30: ...30 Notes...

Страница 31: ...s between the results of eld testing conducted by or for user and laboratory tests corrected for eld performance the latter shall control RECOMMENDATIONS FOR SPECIAL APPLICATIONS OR THOSE RESULTING FR...

Страница 32: ...nt To Insure That Employees Will Not Be Exposed To Health Hazards In Handling Said Material All Applicable Laws And Regulations Shall Apply IMPORTANT WARRANTY REGISTRATION Your product is covered by t...

Отзывы: