Manual 2100-620A
Page
37 of 107
4. Completing Installation
Once all the installation steps have been completed, and system verification and run test results were satisfactory,
the installation can now be considered “complete.” The Bard-Link
TM
PLC lead/lag controller has been pre-
programmed with what is widely considered to be the most efficient operating parameters—see Table 1.3 on page
40. Further information on exact sequence of operation and advanced programming changes can be found in the
Service section of this manual.
Cool Weather Operation (Free Cooling Available):
Stage 1 Cooling
78°F – Lead unit free-cooling damper opens (Se Cooling Stage 1 Differential)
Stage 2 Cooling
79°F – Lag unit free-cooling damper opens (+ Cooling Stage 2 Differential)
Stage 3 Cooling
81°F – Lead unit compressor, damper will stay open if conditions are conducive for free cooling
(+ Cooling Stage 3 Differential)
Stage 4 Cooling
83°F – Lag unit compressor, damper will stay open if conditions are conducive for free cooling
(+ Cooling Stage 4 Differential)
Hi-Temp Alarm #1 85°F
Hi-Temp Alarm #2 90°F – Emergency ventilation initiates, both dampers open, both blowers run
75°F – All cooling stops, blowers stop (Setpoint -2°F)
Stage 1 Heating
58°F – Lead unit heat strip activates
Stage 2 Heating
56°F – Lag unit heat strip activates
Low-Temp Alarm
45°F
62°F – All heating stops, blowers stop
Warm Weather Operation (No Free Cooling Available):
Stage 1 Cooling
78°F – Lead unit compressor (Se Cooling Stage 1 Differential)
Stage 2 Cooling
83°F – Lag unit compressor (+ Cooling Stage 2, Stage 3 and Stage 4 Differentials)
Hi-Temp Alarm #1 85°F
Hi-Temp Alarm #2 90°F – Emergency ventilation initiates, both dampers open, both blowers run
75°F – All cooling stops, blowers stop (Setpoint -2°F)
3. Conduct Run Test
Execute a run test on each unit to verify the equipment
is functioning correctly.
On Bard-Link
TM
controller, navigate to the Run Test
screen (Figure 1.32).
FIGURE 1.32
Executing Run Test
1) From the Main Menu screen, press the UP
or DOWN key to get to Technician menu, hit
ENTER key. (If not already on Main Menu
screen, press MENU key to get to Main Menu.)
2) Use Up or DOWN key to get to Service menu,
press ENTER key.
3) Use Up or DOWN key to get to Control menu,
press ENTER key.
4) Cursor will be flashing in upper left corner of
screen. Press ENTER key to scroll to U1 Run
Test.
5) Press UP key to change 'No" on screen to
"Yes". Unit 1 will begin the run test.
Note:
While initiating the run test on each
unit, use this opportunity to appropriately label
each system as “Unit 1” or “Unit 2.”
6) After the Unit 1 run test ends, press ENTER
key to scroll to U2 Run Test.
7) Press UP key to change 'No" on screen to
"Yes". Unit 2 will begin the run test.
Run Test Approximate Timings (in Minutes)
Blower
On: 0:00
Damper
Open: 0:00 – 2:40
Closed: 2:41 – 4:57
Compressor On: 4:58
Off: 6:00
Heat
On: 6:01
Off: 7:10
Blower
Off: 8:19
Содержание D36A2P/BLD.10304
Страница 6: ...Manual 2100 620A Page 6 of 107 ...
Страница 7: ...Manual 2100 620A Page 7 of 107 SECTION 1 INSTALLATION INSTRUCTIONS ...
Страница 39: ...Manual 2100 620A Page 39 of 107 SECTION 2 SERVICE INSTRUCTIONS ...
Страница 73: ...Manual 2100 620A Page 73 of 107 SECTION 3 PARTS MANUAL ...
Страница 88: ...Manual 2100 620A Page 88 of 107 BARD LINKTM PLC LEAD LAG CONTROLLER SEXP 755 6 4 8 7 2 9 1 5 3 ...
Страница 90: ...Manual 2100 620A Page 90 of 107 ...
Страница 91: ...Manual 2100 620A Page 91 of 107 SECTION 4 APPENDICES ...