5. Network setup
5.1
Test Green BCM Box
Make sure that the mains cable is connected, and connect the Green BCM Box to the mains.
Switch on Green BCM Box by one of the following controls: LAN; IR; push button.
In case none of the controls is available,
push the RESET button: This will reboot the
box!
En cas aucun des contrôles est disponible,
appuyez sur le bouton RESET: Ce redémarre
la boîte!
When Green BCM Box is up and running, the green power LED is on.
Each time Green BCM Box switches on, the processor will initially test the basic functions (POST). Finally, the
processor will boot the operating system from the hard disk and start Barco Wall Control Manager service.
The Barco Wall Control Manager client application can be downloaded from the homepage of the Green BCM
BOX. Please refer to the user manual of Barco Wall Control Manager software.
5.2
Switching off Green BCM Box, Stand-by Mode
Switch off Green BCM Box by one of the following controls: LAN; IR; Green ONOFF Buton.
If shut down, Green BCM Box will switch off automatically thereby changing to the standby mode in which all
components of intensive performance are shut down completely.
Switch On Green BCM Box again by one of the following controls: button SwitchON on the web site; IR Remote
Control; Green ONOFF button. The processor will start up again. The green power LED will once again light up
continuously.
Please note that the Green ONOFF button
requires to be pushed several seconds
before the system starts up / goes to
standby. This behavior is by default to
prevent switching the wall on and off by
accident. So keep in mind that short pushes
are ignored!
Se il vous plaît noter que le bouton vert
ONOFF nécessite d'être poussé plusieurs
secondes avant que le système démarre /
se met en veille. Ce comportement est par
défaut pour éviter la mise sous tension et
hors du mur par accident. Donc, gardez à
l'esprit que pressions courtes sont
ignorées!
When switched to standby, the BCM wall
service is also stopped. It is only a small
controller in the control unit which stays
alive and which allows accessing the BCM
via its IP address. When accessed, a web site
is launched with a button to switch on the
entire system.
Please note: after clicking the SwitchOn
button, it takes several minutes until all
displays are running again.
In case you clicked the SwitchOn button by
mistake, cancel the command by clicking
SwitchOff.
En position de veille, le service de la paroi
BCM est également arrêté. Ce est
seulement un petit contrôleur dans l'unité
de commande qui reste en vie et qui
permet d'accéder à la BCM via son adresse
IP. Lorsque l'on accède, un site web est
lancé avec un bouton pour passer sur
l'ensemble du système.
Se il vous plaît noter: après avoir cliqué
sur le bouton SwitchOn, il faut plusieurs
minutes jusqu'à ce que tous les affichages
sont à nouveau en cours d'exécution.
Dans le cas où vous avez cliqué sur le
bouton SwitchOn par erreur, annulez la
commande en cliquant déconnexion.
Green BCM Box can be completely disconnected form the power supply by pulling the mains plug. The green
power LED will extinguish completely within a few seconds.
Barco – Green BCM Solution – R591346 – user's manual – Revision 04– November-2016
____________________________________________________________________
39