7 / 24
0006081484_201104
EN
GL
IS
H
Gas train supplied by the manufacturer
Responsibility of the installer
GAS SUPPLY LINE
The gas supply scheme is shown in the diagram below. The gas
train is certified in accordance with regulation EN 676 and is supplied
separately to the burner.
A manual shut off valve, an interception valve and an anti-
vibration joint must be installed upstream of the gas valve, as
shown in the diagram.
GENERAL GAS BURNER SYSTEM
N° 02910950-PN
Legend
1) Manual shut off valve
2) Anti-vibration joint
3) Gas filter
4) Minimum gas pressure switch
5) Safety valve
6) Pressure regulator
7) Valve seal control device (obligatory for burner with maximum
nominal thermal output over 1200 kW)
8) Pneumatic working valve
9) Control servomotor
10) Air adjustment gate
11) Air pressure switch
12) Combustion head
Содержание TBG 45 PN-V
Страница 2: ......
Страница 26: ...24 24 0006081484_201104 ENGLISH ...
Страница 50: ...24 26 0006081484_201104 ESPAÑOL ...
Страница 74: ...24 26 0006081484_201104 FRAÇAIS ...
Страница 98: ...24 24 0006081484_201104 TÜRKÇE ...
Страница 123: ...123 126 0006081484_201104 ...