18 / 24
0006081484_201104
EN
GL
IS
H
Equipment and
programmer
Safety
time
Preventilation
time
Pre-
ignition
Post-ignition
Time between open-
ing of 1
st
flame valve
and 2
nd
flame valve
Air shutter open-
ing stroke time
Air shutter clos-
ing stroke time
LME 22.331A2
3
30
2
2
11
12
12
LME 22.233A2
3
30
2
2
11
30
30
CONTROL EQUIPMENT AND COMMANDS FOR GAS BURNERS LME 22...
IONISATION CURRENT MEASUREMENT
To measure the ionisation current, remove the jumper between
terminals 30-31 on the printed circuit with the burner off.
Connect a microammeter to the terminals (with a suitable scale
to have the burner restart). Once the flame has appeared it will
be possible to measure the ionisation current, the minimum value
of which to ensure the working of the equipment is shown in the
specific wiring diagram. After making the measurement, reset the
jumper that has been disconnected.
MANUAL BURNER OPERATION INSTRUC-
TIONS
Combustion may be checked throughout the entire modulation range
by means of manual adjustments to operation. Use the modulation
connector (B) in the figure, supplied with the burner. After discon-
necting the 4 pole socket (A) taking signals from the thermostat line
or the power regulator, insert the connector in its place (B). Use the +
button to increase the flow of gas and air or the - button to decrease.
After completing the check, plug the 4 pole plug (A) back in to restore
automatic modulation.
which the ignition is regular and accept this new position
as definitive. We remind you that is preferable, in the case
of the small flame, to limit the quantity of air to the least
possible needed for safe ignition, even in the most difficult
circumstances.
Содержание TBG 45 PN-V
Страница 2: ......
Страница 26: ...24 24 0006081484_201104 ENGLISH ...
Страница 50: ...24 26 0006081484_201104 ESPAÑOL ...
Страница 74: ...24 26 0006081484_201104 FRAÇAIS ...
Страница 98: ...24 24 0006081484_201104 TÜRKÇE ...
Страница 123: ...123 126 0006081484_201104 ...