Masoneilan SVI II AP Digital Positioner Quick Start Guide
=
|
47
© 2018 Baker Hughes, a GE company, LLC. All rights reserved.
Overview
This section provides the calibration procedures to ensure proper valve positioning. Operational
checkout, configuration and calibration procedures are described using an SVI II AP that has a
display with pushbuttons.
Perform all procedures in this section before putting
the SVI II AP into operation.
Check Out Procedures
SVI II AP checkout consists of physical and operational checkout procedures. The physical check-
out procedures include:
“Inspecting Actuator, Linkages, or Rotary Adapter” on page
48
“Verifying Mounting and Linkage Adjustment” on page
48
“Checking the Magnet” on page
48
“Checking the Air Supply” on page
50
“Checking the Electronic Module Connections” on page
50
The SVI II AP cover must be in place and secured
using all four screws during operation.
NOTE
CAUTION
3. Check Out, Configuration
and Calibration
Содержание Masoneilan SVI II AP
Страница 6: ...This page intentionally left blank...
Страница 10: ...This page intentionally left blank...
Страница 68: ...This page intentionally left blank...
Страница 90: ...2018 Baker Hughes a GE company LLC All rights reserved 90 BHGE Spare Parts...
Страница 92: ...2018 Baker Hughes a GE company LLC All rights reserved 92 BHGE...
Страница 94: ...This page intentionally left blank...
Страница 102: ...This page intentionally left blank...
Страница 105: ...This page intentionally left blank...
Страница 106: ...This page intentionally left blank...
Страница 107: ...This page intentionally left blank...