© 2020 Baker Hughes Company. All rights reserved
.
=
Masoneilan SVI II AP Digital Positioner Quick Start Guide | 62
Operational Checkout
The operational checkout of the SVI II AP consists of:
Connecting the SVI II AP to a current source
Checking the pushbutton locks
Powering up the SVI II AP
Connecting to the Current Source
Connect to a DC mA current source then check and configure
with the local display and pushbuttons, if so equipped. The
following section describes configuration and calibration with
the optional local display and pushbuttons. If the SVI II AP is
not equipped with local display use ValVue and a PC with a
HART
®
modem or a HART
®
Handheld Communicator.
NOTE
When an SVI II AP is turned on it is advisable to apply
the air supply before applying the electrical input sig-
nal.
Powering Up the SVI II AP
WARNING
This process can cause the valve to move. Before
proceeding be sure the valve is isolated from the pro-
cess. Keep hands clear from moving parts.
NOTE
When an SVI II AP is turned on it is advisable to apply
the air supply before applying the electrical input sig-
nal.
Содержание Masoneilan SVI II AP Series
Страница 6: ...This page intentionally left blank ...
Страница 76: ...This page intentionally left blank ...
Страница 82: ...This page intentionally left blank ...
Страница 105: ...Masoneilan SVI II AP Digital Positioner Quick Start Guide 105 2020 Baker Hughes Company All rights reserved ...
Страница 106: ... 2020 Baker Hughes Company All rights reserved Masoneilan SVI II AP Digital Positioner Quick Start Guide 106 ...
Страница 108: ...This page intentionally left blank ...
Страница 122: ...This page intentionally left blank ...
Страница 123: ...This page intentionally left blank ...