© 2020 Baker Hughes Company. All rights reserved
.
=
Masoneilan SVI II AP Digital Positioner Quick Start Guide | 56
Check Out Procedures
SVI II AP checkout consists of physical and operational
checkout procedures. The physical checkout procedures
include:
“Inspecting Actuator, Linkages, or Rotary Adapter” on
page
“Verifying Mounting and Linkage Adjustment” on
page
“Checking the Air Supply” on page
“Checking the Electronic Module Connections” on
page
The SVI II AP cover must be in place and
secured using all four screws during oper-
ation.
CAUTION
Содержание Masoneilan SVI II AP Series
Страница 6: ...This page intentionally left blank ...
Страница 76: ...This page intentionally left blank ...
Страница 82: ...This page intentionally left blank ...
Страница 105: ...Masoneilan SVI II AP Digital Positioner Quick Start Guide 105 2020 Baker Hughes Company All rights reserved ...
Страница 106: ... 2020 Baker Hughes Company All rights reserved Masoneilan SVI II AP Digital Positioner Quick Start Guide 106 ...
Страница 108: ...This page intentionally left blank ...
Страница 122: ...This page intentionally left blank ...
Страница 123: ...This page intentionally left blank ...