© 2020 Baker Hughes Company. All rights reserved
.
=
Masoneilan SVI II AP Digital Positioner Quick Start Guide | 14
WARNING
Failure to adhere to the requirements listed in this
manual may cause loss of life and property.
Before installing, using, or carrying out any mainte-
nance tasks associated with this instrument, READ
THE INSTRUCTIONS CAREFULLY. Refer to “Haz-
ardous Location Installation” on page
90 of this guide
for detailed instructions.
4
Install the Remote Position Sen-
sor, if necessary.
See
Masoneilan Valve Solu-
tions Remote Position Sen-
sor Quick Start Guide
(GEA31195 or P/N
011525100-888-0000) for
instructions.
5
Connect the pneumatic tubing
to the SVI II AP.
43 for instructions.
See “Natural Gas Supply
Considerations” on page
for notes on naturals gas
installation.
6
Connect the air supply to the
SVI II AP.
46 for instructions.
7
Connect the positioner to the
HART
®
Control Loop segment
by installing the SVI II AP wir-
ing.
47 for instructions.
8
Configure/calibrate using
ValVue
TM
.
See page
for instructions.
Configure/calibrate using a
HART
®
Hand Held Communica-
tor.
73 for instructions.
Table 1
SVI II AP Installation Steps (Continued)
Step No.
Procedure
Reference
Содержание Masoneilan SVI II AP Series
Страница 6: ...This page intentionally left blank ...
Страница 76: ...This page intentionally left blank ...
Страница 82: ...This page intentionally left blank ...
Страница 105: ...Masoneilan SVI II AP Digital Positioner Quick Start Guide 105 2020 Baker Hughes Company All rights reserved ...
Страница 106: ... 2020 Baker Hughes Company All rights reserved Masoneilan SVI II AP Digital Positioner Quick Start Guide 106 ...
Страница 108: ...This page intentionally left blank ...
Страница 122: ...This page intentionally left blank ...
Страница 123: ...This page intentionally left blank ...