supersedes page 23 of owner’s Manual
9
balneo
®
- cella
installation
1. Bath site
2. installation
iMportant
• do not remove the protective plastic film from the bath and place a drop-cloth in the thermomasseur
®
during installation to protect the acrylic.
• the thermomasseur
®
must be secured to the floor.
2
3/4
"
[7 cm]
5
1/2
"
[14 cm]
2-1
2-1
Cella
Cella 6036
Cella
Cella 6036
1-1
once the floor has been finished and is
perfectly level, determine the exact location
of the thermomasseur
®
. mark the following
on the floor:
a) position of the four feet;
b) holes to be drilled for the drain and air
intake for the turbine.
1-2
drill the four holes for the feet with a
3/16’’ drill bit and the drain and air intake
openings with a 2’’ hole saw.
Balneo
®
- Cella - installation
•
Balneo
®
series baths cannot be drilled for faucet installation. faucets must be freestanding or
wall-mounted models.
warning
2-1
install the drain and overflow set on the
bath and the first section of the air intake
pipe (1 1/2’’ aBs) under the floor. Cover
the aBs pipe with pipe concealer
(included).
for geysair-equipped baths,
also run the water hose and wiring
through the pipe concealer.
2-2
once the thermomasseur
®
is in place
with piping installed in the floor, secure
the four feet with screws and washers
provided.
(a-2)
2-3
for geysair-equipped baths,
connect the
geysair electrical wire supplied (orange
label) to the turbine wire (also marked with
an orange label) in the junction box.
test
for grounding continuity between the
bath grounding terminal
and the
bath power supply.
failure to perform
the grounding continuity test could
result in serious personal injury.