geysair
tm
addendum to the owner’s manual |
THERMOMASSEUR
®
1 800 463.2187
From 8 a.m. to 8 p.m. Monday to Thursday (EST) From 8 a.m. to 5 p.m. on Friday (EST)
Printed in Canada. Copyright © september 2012 Bainultra inc. all rights reserved. 45100169
some products, specifications, and services mentioned in this manual are described
in pending patent applications or are protected by patents.
T
H
E
R
M
O
M
A
S
S
E
U
R
®
10
supersedes page 25 of owner’s Manual
origami freestanding design series - installation
2. installation
1. loCation
oRIGamI fReestandInG
desIGn seRIes
installation
1-1
2-1
2-3
2-6
2-2
1-1
2-1
2-3
2-6
2-2
1-1
2-1
2-3
2-6
2-2
1-1
2-1
2-3
2-6
2-2
2-1
assemble the drain on the bathtub. use
the flexible 1 1/2” pipe provided for the
junction between the overflow and the
t-joint. ensure watertightness. this
operation is much easier to complete
when the bathtub rests on its side. Place a
cover or protective cardboard on the floor
before positioning the bathtub on its side.
2-2
apply a joint of silicone under the edge
of the base of the bathtub.
2-3
install the bathtub on the anchor points
fastened to the floor and immediately wipe
away any excess silicone. Connect the drain.
2-4
install the turbine according to the
instructions in the turBine – distanCe
installation section of the manual.
the air inlet is located to the left of the
bathtub drain and, ifapplicable, control
and option connection cables to the right.
Connect control and option cables
if applicable.
for geysair-equipped
baths,
also run the water hose and
electrical wiring through the floor.
1-1
once the compartment around the drain is
completed in the floor, place the installation
template on the ground at the chosen location.
1-2
align the position of the overflow drain with
the floor drain and ensure that the compart-
ment size corresponds to requirements.
1-3
mark the location of the anchor point screws.
1-4
remove the installation template and screw
in the anchor points in the marked locations.
Содержание GEYSAIR
Страница 2: ......