T
U
R
B
IN
E
geysair
tm
addendum to the owner’s manual |
TURBINE
1 800 463.2187
From 8 a.m. to 8 p.m. Monday to Thursday (EST) From 8 a.m. to 5 p.m. on Friday (EST)
Printed in Canada. Copyright © september 2012 Bainultra inc. all rights reserved. 45100169
some products, specifications, and services mentioned in this manual are described
in pending patent applications or are protected by patents.
20
supersedes page 31 of owner’s Manual
a. to remove turBine
witH geysair
from its Present suPPorts
B. to reinstall turBine
turBine
witH geysair
- remote mounting turBine installation
2 x
A-4
a-1
disconnect electrical supply to bath.
a-2
disconnect wires going to turbine.
a3
using a flathead screwdriver, loosen
fitting.
a-4
for ayoura
®
freestanding only:
disconnect turbine at fitting by loosening
lower and upper fitting with flathead
screwdriver.
a-5
Cut the electrical cable connecting the
turbine to the geysair unit. this wire is
marked with a yellow label.
B-1
mount turbine to wall or wall structure
by inserting 1” (2.5 cm) screws in
mounting holes.
B-2
use as many 1 1/2” (4 cm) aBs or PvC
pipes as necessary to connect turbine to
bath. follow all relocation instructions
provided in installation manual. to reduce
vibrations, avoid having air line pipes
touch home structure.
B-3
secure pipe at air output of turbine by
drilling a 1/8” (0.3 cm) hole and by using
1/2” (1.3 cm) screw. (do not glue).
B-4
strip the two ends of the cut cable. Con-
nect each end to a terminal box. Connect
the two terminal boxes with minimum
14awg 3-stranded cable.
warning:
test for grounding continuity between
the bath grounding terminal
and
bath power supply.
failure to perform
the grounding continuity test could
result in serious personal injury.
B-5
reconnect wires going to turbine.
B-6
Connect bathtub’s power supply.
iMportant
•
these stePs must Be eXeCuted By a Qualified eleCtriCian
• geysair should not Be installed remotely
Содержание GEYSAIR
Страница 2: ......