39
Keep spacing between the center of
the rafters at the lower edge of the
panel and secure with one 2" nail into
each rafter
(Fig. E)
.
Move to the top of the panel and keep
spacing between the center of the
rafters. Secure with one 2" nail into
each rafter
(Fig. E)
.
Nail the roof panel using 2" nails 6"
apart on edges and 12" apart inside
panel.
Attach the second
23-7/8 x 48"
upper
roof panel ush to rst panel, ush at
peak and with the 1/4" measurement
(Fig. F, G)
.
3
Attach the lower roof panels ush to the
upper panels
(Fig. J)
and 3/4" on rafter
(Fig. I)
and with a 1/4" measurement at
the gable trim
(Fig. J)
.
Nail the roof panel using 2" nails 6" apart
on edges and 12" apart inside panel.
Repeat process to attach roof
panels on the opposite side.
4
PARTS REQUIRED:
ROOF PANELS
3/4"
GAUGE BLOCK
GAA
DOOR
DOOR
12"
(30,5 cm)
6" (15 cm)
7/16 x 23-7/8 x 48"
(1,1 x 61 x 122 cm)
1/4"
(6 mm)
Fig. G
Fig. E
22-1/4"
(56,5 cm)
24"
(61 cm)
22-1/4"
(56,5 cm)
24"
(61 cm)
24"
(61 cm)
NOTE:
Measurements from inside of panels
2" Nail
Flush
Fig. F
19"
(48 cm)
96"
(244 cm)
1/4"
(6 mm)
Gable Trim
Flush
Fig. J
Gable
Trim
3/4"
(1,9 mm)
3/4"
(1,9 mm)
Fig. I
Содержание HANDY HOME PRODUCTS MARCO Series
Страница 2: ...This page intentionally left blank...