Disconnection Procedure
© b2 electronic GmbH
DHV0086 Rev06
97
Steps D1-D7 describe the normal disconnection procedure.
Step Procedure
D1
Press emergency off
42
Stop test according to
see 5.4 Interrupting a Test on page 73
and press emergency off button
to lock against re-energise.
D2
Verify HV status. Wait until red LED
71
light deactivates.
(Red light indicates residual voltage > 100V)
D3
Discharge and earth the DUT complying with local safety regulations .
D4
Lock HVA in disabled state to prevent unauthorized use:
• Turn key switch
43
to the OFF position.
D5
Disconnect the Test Lead
• Disconnect test lead from DUT
17
.
• Disconnect
earth cable from the HV cable shield
2
• Unscrew HV test lead from HVA HV output connector
10
D6
• Disconnect power supply cable from power supply plug
30
.
D7
Disconnect all earthing cables
• Disconnect earthing cable from DUT earth
3
4
.
• Disconnect earthing cable form HVA earthing connector
1
.
Содержание HVA Series
Страница 2: ...b2 electronic GmbH DHV0086 Rev06 2...
Страница 67: ...Test Procedure b2 electronic GmbH DHV0086 Rev06 67...
Страница 95: ...Reporting b2 electronic GmbH DHV0086 Rev06 95...