Test Procedure
© b2 electronic GmbH
DHV0086 Rev06
65
Step
Procedure
(Configure automatic sequence)
AS10: Test Parameters – Voltage Steps
Specify the number of voltage steps to be
applied to the DUT.
• Min. voltage levels: 1 Step
• Max. voltage levels: 15 Steps
AS11: Test Parameters – Test Voltage
Specify test voltage for each step.
AS12: Test Parameters – Duration
Specify the test duration for each step:
• Min.: 1 period
• Max.: 500 periods
T = 1/f
The testing time depends on the frequency
chosen.
Note: When selecting Auto Frequency can
differ from the expected value.
Содержание HVA Series
Страница 2: ...b2 electronic GmbH DHV0086 Rev06 2...
Страница 67: ...Test Procedure b2 electronic GmbH DHV0086 Rev06 67...
Страница 95: ...Reporting b2 electronic GmbH DHV0086 Rev06 95...