background image

Fuse
Safety rules
CAT III - Overvoltage of class three, secondary pollution (according to IEC61010) refers to the level of protection for
the pulse compression. Typical installation location includes: distribution of three-phase circuit (including a single
commercial lighting circuit) position-fixed equipment; interior lighting equipments in large buildings, lines; industrial
field devices.
CAT IV - Overvoltage of class four, secondary pollution (according to IEC61010) refers to the level of protection for the
pulse compression. typical installation location includes: Three-phase utility power supply equipment for any outdoor
power lines or equipment; Any outdoor transmission lines; Electricity meter front-end over-current protection device.

1.5. Input/Output terminals

1 - output point for loop circuit power
2 - current measurement input common point for DC output common point for loop circuit power Simulates the output of
a transmitter group (with external power supply connected in series.) With protection by 63mA fuse.
3 - common point for all testing Common point for simulate transmitter output.
4 - voltage output of 600V�Ω�diode and continuity test.

Содержание AX-C705

Страница 1: ...oduct to see whether it is damaged in the shipment or not Check the materials to see whether they are the same as shown in the packing list Keep the packing materials for late delivery Standard and ch...

Страница 2: ...l understanding of this Manual before use Make sure the requirements in the Manual are strictly followed and keep the Manual for reference whenever needs Mis operation may cause accidents and damages...

Страница 3: ...the level of protection for the pulse compression typical installation location includes Three phase utility power supply equipment for any outdoor power lines or equipment Any outdoor transmission li...

Страница 4: ...n stable 2 3 DC voltage measurement Turn the rotary switch to Insert black probe into COM terminal and insert red probe into _V terminal Connect the probes to the circuit under test and then read the...

Страница 5: ...e electricity fully from all capacitor before testing continuity Turn the rotary switch to D press green button and select test Insert black probe into COM terminal and insert red probe into _V termin...

Страница 6: ...d 250 HART Insert black probe into mA terminal and insert red probe into LOOP terminal Connect the probes to the circuit under test and then read the measured value when stable Press mA button to disp...

Страница 7: ...A output Otherwise low impedance from other position of rotary switch will appear and cause current higher than 35mA to go through the loop circuit Turn the rotary switch to the screen displays OUTPUT...

Страница 8: ...and latch the battery door before using the meter Note The new and old Batteries can not be mixed Max Voltage applied to output terminals about 32V Max current applied to output terminals about 25mA M...

Страница 9: ...to IEC61326 1 Group 1 Class B Surge protection 8kV according to IEC61010 1 2001 Identification Mark CE Quality Standard Develops designs and manufactures in conformity with ISO 9001 4 2 General featu...

Страница 10: ...ark DC voltage 50V 10mV 0 5 4 Measuring impedance 10 M standard value Common mode restrain 50Hz or 60Hz 100Db String mode restrain 50Hz or 60Hz 45dB Overload protection 600V peak peak value AC voltage...

Страница 11: ...transmitter 20mA 0 000 22 000mA 0 001mA 0 2 4 external power supply 5 28V Max load 1k at 20mA LOOP Loop circuit power 24V 10 Max output current 25mA Max Voltage applied to output terminals about 32V...

Отзывы: