A-Series Dobby Loom Assembly Manual
Appendix II: Air Assist Options
Installing An A-Lift
Page | 151
3)
It is best perform one turnbuckle rotation and then test, repeating a
single turn each time until the slide plate will move up to the slide
plate bumpers after pulling it down ½ inch.
4)
Tighten the jam nut to lock in this turnbuckle position.
Lift Cable
1)
Guide the lift cable attached to the bottom center of the slide plate
down to the left pulley on the axle.
Figure 141 - Slide Plate Eyebolt and cable
2)
Clip the end of the cable to the rod end of the cylinder.
3)
The line of the cable from the dobby to the pulley should be
straight. The cable should not be at a diagonal from any point to
point.
4)
Slide the pulley into position on the axle and secure it into place by
tightening a stop collar on either side of the pulley.
5)
You can also adjust the tension of the cable by turning the
turnbuckle on the cable.
Содержание A Series
Страница 2: ......
Страница 17: ...A Series Dobby Loom Assembly Manual Introductory Information the Loom Page 9 Figure 1 Full Loom Left Side ...
Страница 18: ...Introductory Information A Series Dobby Loom Assembly Manual Page 10 the Loom Figure 2 Full Loom Right Side ...
Страница 19: ...A Series Dobby Loom Assembly Manual Frame Assembly Frame Assembly Page 11 FRAME ASSEMBLY FRAME ASSEMBLY ...
Страница 66: ......
Страница 100: ......
Страница 126: ......
Страница 136: ......
Страница 173: ...A Series Dobby Loom Assembly Manual The Fine Print The Fine Print Page 165 THE FINE PRINT THE FINE PRINT ...
Страница 176: ...The Fine Print A Series Dobby Loom Assembly Manual Page 168 Notice to Users in the European Union ...