A V G A nti- V irus Bus ines s E dition 2 0 1 1 © 2 0 1 0 C opyright A V G T ec hnologies C Z, s .r.o. A ll rights res erved.
1 1 0
6.3. Synchronization Process
Stations managed by
AVG Remote Administration
periodically perform
synchronization with the
AVG DataCenter
. The process includes synchronization of:
·
Station settings
·
Scan results
·
Station components states
You may also need to review the
Network Requirements
chapter for more information
on connection requirements needed for successful synchronization.
6.3.1. Station Settings Synchronization
During the synchronization of station settings:
·
mandatory settings are transferred from the DataCenter to the station,
·
non-mandatory settings are transferred from the Station to the DataCenter.
The synchronization is performed periodically. By default, the settings synchronization
process is done every 60 minutes. To alter the synchronization period for all stations,
follow these steps:
1.
In the
AVG Admin Console
select
Tools
from the upper main menu and choose
the
Shared settings for stations
item.
2.
Select the
Remote Administration
node.
3.
From the
Synchronize configuration every
drop down menu choose the
required value. Close the dialog by clicking the
OK
button.
4.
Wait until all stations get synchronized.
Alternatively, you can force immediate synchronization of all stations: In the
navigation tree, right-click on the
Stations
node and select
Synchronize settings
from the context menu.
Note:
To change the setting only for stations in a group, simply repeat the process
from step two after you right click on
Stations/YourGroupName
and select
Shared
Settings for group
from the context menu.
Additionally, the synchronization happens:
·
every time the station powers on/goes online, its settings are synchronized at
latest within the period,
·
when the station connects to the
AVG DataCenter
the first time, its settings
are synchronized immediately,