
IP Office Installation
Page 78
15-601042 Issue 20b (16 July 2009)
IP Office
5.3 Unpacking
Use the following procedure when unpacking any equipment supplied by
Avaya or an Avaya reseller or distributor.
Objective
- To check that the correct equipment has been supplied and
that no damage has occurred during transit.
Information Required
•
o
Equipment Checklist
.
Draw up an installation checklist of the parts and equipment
expected.
Procedure
•
o
Check for Package Damage
.
Before unpacking any equipment, check for any signs of damage that may have occurred during transit. If any
damage exists bring it to the attention of the carrier.
•
o
Check the Correct Parts Have Been Delivered.
Check all cartons against the packing slip and ensure that you have the correct items. Report any errors or
omissions to the equipment supplier.
•
o
Retain All Packaging and Documentation.
While unpacking the equipment, retain all the packaging material. Fault returns are accepted only if repackaged in
the original packaging. If performing a staged installation, the original packaging will also assist when repacking
equipment to be moved to the final install site.
•
o
Ensure that Anti-Static Protection Measures are Observed.
Ensure that anti-static protection measures are observed at all times when handling equipment with exposed
electrical circuit boards.
•
o
Check All Parts.
Visually inspect each item and check that all the necessary documentation and accessory items have been
included. Report any errors or omissions to the dealer who supplied the equipment.
•
o
Check All Documentation.
Ensure that you read and retain any documentation included with the equipment.
Содержание IP Office Phone Manager
Страница 2: ...15 601042 Issue 20b 16 July 2009 IP Office Installation IP Office ...
Страница 7: ......
Страница 9: ......
Страница 12: ...IP Office Installation Page 11 15 601042 Issue 20b 16 July 2009 IP Office System Overview Chapter 2 ...
Страница 63: ......
Страница 64: ...IP Office Installation Page 63 15 601042 Issue 20b 16 July 2009 IP Office Planning Chapter 3 ...
Страница 69: ...IP Office Installation Page 68 15 601042 Issue 20b 16 July 2009 IP Office ...
Страница 70: ...IP Office Installation Page 69 15 601042 Issue 20b 16 July 2009 IP Office Pre Configuration Chapter 4 ...
Страница 75: ......
Страница 76: ...IP Office Installation Page 75 15 601042 Issue 20b 16 July 2009 IP Office IP500 Basic Installation Chapter 5 ...
Страница 100: ...IP Office Installation Page 99 15 601042 Issue 20b 16 July 2009 IP Office IP500 Basic Installation Rack Mounting ...
Страница 109: ......
Страница 110: ...IP Office Installation Page 109 15 601042 Issue 20b 16 July 2009 IP Office IP400 Basic Installation Chapter 6 ...
Страница 141: ......
Страница 142: ...IP Office Installation Page 141 15 601042 Issue 20b 16 July 2009 IP Office Phone Installation Chapter 7 ...
Страница 157: ...IP Office Installation Page 156 15 601042 Issue 20b 16 July 2009 IP Office ...
Страница 158: ...IP Office Installation Page 157 15 601042 Issue 20b 16 July 2009 IP Office External Trunk Configuration Chapter 8 ...
Страница 165: ...IP Office Installation Page 164 15 601042 Issue 20b 16 July 2009 IP Office ...
Страница 166: ...IP Office Installation Page 165 15 601042 Issue 20b 16 July 2009 IP Office Additional Processes Chapter 9 ...
Страница 197: ...IP Office Installation Page 196 15 601042 Issue 20b 16 July 2009 IP Office ...
Страница 198: ...IP Office Installation Page 197 15 601042 Issue 20b 16 July 2009 IP Office System Components Chapter 10 ...
Страница 342: ...IP Office Installation Page 341 15 601042 Issue 20b 16 July 2009 IP Office System Components Licence Keys ...
Страница 391: ......
Страница 392: ...IP Office Installation Page 391 15 601042 Issue 20b 16 July 2009 IP Office Safety Statements Chapter 11 ...
Страница 409: ......
Страница 410: ...IP Office Installation Page 409 15 601042 Issue 20b 16 July 2009 IP Office ...