GDO-11 Ero Installation Manual
21
21. After Installation Care
21.1 Service Checklist
Preventative servicing of your garage door and opener, is just as
important as servicing your car. Much like the engine of your car, your
garage door is made up of numerous moving parts designed to lift and
lower your door safely and efficiently.
Ongoing preventative servicing ensures that your door continues to
function within factory specifications, greatly reduces the risk of failure
and repair bills down the track and ensures you maintain your Warranty.
DO NOT DO IT YOURSELF:
WARNING! Failure to maintain your your
garage door voids the warranty on your
garage door opener.
DIY
Door adjustments should only be
carried out by experienced persons,
as this function can be dangerous if
not performed under strict safety
procedures.
Run the Safety Testing procedures MONTHLY in
Section 12 to ensure garage door is fit for use.
tip
TECHNICIAN CHECKLIST
1. Lubrication of the critical moving parts including chain drive, tracks, wheels or cable drum.
2. Tightening of door mounting points along with door bolts, screws, cables and connectors.
3. Adjustment of spring tension to limit ‘spring fatigue’.
4. Adjustment of opener travel limits and force margin to ensure the door opens and closes to specification.
5. Assessment and adjustment of safety components and accessories including safety beams, Auto-Lock and Safe Lock (if
installed)
6. Assessment of the door alignment and the diagnosis of irregular operation remedies.
7. Record Cycle count at each service to establish next date of service (as per table)
SERVICE 1
(12 months after installation
or 3,000 cycles)
SERVICE 2
(3 years after installation)
SERVICE 3
(5 years after installation)
DATE:
BUSINESS NAME:
TECHNICIAN NAME:
PG3 COUNTERS
OPEN
CLOSE
OPEN
CLOSE
OPEN
CLOSE
STALLS
OBSTRUCTIONS
SENSOR FAULTS
OVERLOADS / CUT-OUTS
WARRANTY CYCLES
FIRMWARE UPDATE AVAILABLE?
IF ‘YES’ PLEASE UPDATE
FIRMWARE
YES
NO
YES
NO
YES
NO
CURRENT FORCE MARGIN
TECHNICAL SIGNATURE:
SERVICE 4
(7 years after installation)
SERVICE 5
(9 years after installation)
DATE:
BUSINESS NAME:
TECHNICIAN NAME:
PG3 COUNTERS
OPEN
CLOSE
OPEN
CLOSE
STALLS
OBSTRUCTIONS
SENSOR FAULTS
OVERLOADS / CUT-OUTS
WARRANTY CYCLES
FIRMWARE UPDATE AVAILABLE?
IF ‘YES’ PLEASE UPDATE
FIRMWARE
YES
NO
YES
NO
CURRENT FORCE MARGIN
TECHNICAL SIGNATURE: