MODULEX CONTROLLER OPERATION
45
Connector 3 [III]
Connector 9 [IX]
Pin 1: FBR heating circuit 2 (room sensor) / 0-10V IN / Light
Pin 2: FBR heating circuit 2 (ground)
Pin 3: FBR heating circuit 2 (set value) / Pulse counter for output measurement
CAN Bus Pin 1 = H (Data)
CAN Bus Pin 2 = L (Data)
CAN Bus Pin 3 = - (ground, Gnd)
CAN Bus Pin 4 = + (12V supply)
Содержание Modulex E8
Страница 1: ...Operation User Guide Modulex E8 Controller ...
Страница 30: ...MODULEX CONTROLLER OPERATION 28 Figure 3 7 INSTALLATION Menu Flow Chart ...
Страница 50: ......
Страница 51: ...MODULEX CONTROLLER OPERATION A 1 APPENDIX A CONTROLLER MENU LISTINGS ...
Страница 69: ...A 19 MODULEX CONTROLLER OPERATION NOTES ...