19
Assembly Instruction
FVM2
06
Mounting options of the locking plate
locking plate: assembly below
locking plate: assembly top
During
start-up
the 24 V-control voltage may
be switched on only:
• with opened casement
• unhinged opening drive
Only opening drives with internal load depen-
dent cut-off switch (
S3
/
S12
) may be used.
!
!
Test run: Opening drive
Switch on t
he
control voltage
at the opening drive
.
Move opening drive in
CLOSE
direction.
Move opening drive in
OPEN
direction and ensure the
ease of movement of casement.
Assembly locking drive FVM2
DIP switches setting
In a
voltage-free
state: Set the
DIP
switches
correctly, when not mounted the locking drive
FVM2
(see chapter: „DIP
SWITCHES
SETTING
: M
OVING
DIRECTION
AND
THE
LOCKING
STROKE
“).
A
SSEMBLY
WITH
M-COM
Unhinge the opening drive.
Switch off
the
control voltage
from the opening
drive.
I
NSTALLATION
STEP
5
A
:
Assembly opening drive
Mount opening drive (see separate „Assembly and
Commissioning Instructions“ for each drive).
Make the connection for the control voltage to the
opening drive (see chapter: „E
LECTRIC
CONNECTION
“).
opening drive
Locking point
from
locking pin
locking bar
On-site assembly: locking plate
Possibly mount the locking plate
on-site conditions
- as described below:
Untighten the countersunk head srews
.
Mount locking plate
and base plate
on the locking
drive
FVM2
according to site requirements.
Firmly tighten with countersunk screws
(4 Nm).
A
SSEMBLY
WITH
M-COM
- L
OCKING
DRIVE
AND
OPENING
DRIVE
FVM2
The locking pin of locking bar must be
centered in the mounting slot of the locking
plate
.
locking bar
4 N/m
1
2
3
FVM2
4 N/m
locking pin
!
y
y
2
1
FVM2
Factory settings
Test run: locking drive FVM2 (when not mounted)
Make the connection for the control voltage to the
locking
drive
FVM2
(see chapter: „E
LECTRIC
CONNECTION
-
I
NSTALLATION
S
TEP
7
A
“).
Содержание FVM2