MAN - BBR2S - REV: Original | E. Operation
requires verification.
•
Red = the component requires standardization
•
Yellow = the component requires verification
•
Green = the component is ready for testing
1. To begin, select “Verification” from the Main Screen. The screen shown in Figure E.6 will display.
2. Verify the information entered in the Confidence Beam Serial # section matches the information on the
certification of conformance form that was shipped with the BBR2S. Make corrections if necessary.
3. Press the verification button to begin the verification sequence.
4. Verify the load bearing.
a. Place the thin steel beam on the sample supports, and apply a 35mN load to the beam by turning the zero
load regulator.
b. Observe the reading of the LVDT. Gently grasp the shaft and lift it upwards approximately 5mm by observing
the reading of the LVDT.
c. When the shaft is released, it should immediately float downward and gently make contact with the beam.
d. Remove any beams from the supports.
e. Use the zero load regulator arrows to adjust the loading shaft so that it is free floating at the approximate
midpoint of its vertical travel.
f. Gently add a 2g mass to the loading shelf.
g. The shaft will slowly drop down under the weight of the added mass. If everything works as the prompts
require, press “Verification Complete” and then press “Next”.
i. If the results are not in acceptable range, press “Standardization Required” and then press “Next”.
Figure E.6 - Verification main screen