MAN - BBR2S - REV: Original | C. System Overview
5
Back of Unit
1. Incoming Air Connection
2. Air Connections to Load
Frame
3. AC Power Connection
4. Chiller RTD (Connects to
Back of Chiller)
5. USB Connection to BBR
Computer
6. Load Frame Sensor Cables
Figure C.2: BBR2S (Rear View)
1
2
6
3
4
5