18. Install Lock Rods & Linkage components per the drawing Fig.8. Also, install the Crossbeam
Bracket (#96) to middle / outside of each Crossbeam and secure with the provided Hardware
shown in Fig.6.
Note: Crossbeam Linkage Rods may be pre-installed to Crossbeams.
Also, ensure pre-installed T-Bar ‘linkage’ Rod is properly routed through guide ring
weldments located on the underside of the Mainside Runway.
Fig. 8
19. Mount the Power Unit (#8) to the Mainside Column with the attached mounting bracket using the
Hardware provided, shown in Fig.9. Once mounted, fill the Power Unit reservoir tank with
hydraulic fluid. Now, install the 90 degree Hydraulic Fitting (#44) to the high pressure port on the
Power Unit. Connect the electrical power to the Power Unit.
Fig. 9
T-Bar Rod
(Under Mainside Runway)
Long Rod (#80)
Short Rod (#83)
(See Exploded View
Details on Page 23)
Содержание 4P9DXL
Страница 1: ...Jan 2017 Four Post Lift 9 000 lbs Capacity 4 500 lbs per axle INSTALLATION OWNERS MANUAL ATD 4P9DXL...
Страница 4: ...ATD 4P9DXL_rev_0318 FLOOR PLAN LAYOUT ATD 4P9DXL...
Страница 22: ...ATD4P9DXL_rev_0318...
Страница 23: ...ATD4P9DXL_rev_0318...
Страница 24: ...ATD4P9DXL_rev_0318...