ATD4P9DXL_rev_0318
POWER UNIT PRIMING PROCEDURE
THE PROBLEM: Power unit runs fine but will not pump any fluid.
WARNING!! Failure to properly relieve pressure in the following steps can cause injury to personnel.
Step 1 – Locate the check valve, the flush plug to the left of the lowering valve.
Step 2 – Using an Allen wrench and shop towel – with shop towel in place to catch fluid – loosen the
check valve plug 2 ½ turns to allow it to leak.
Step 3 – Push the START button for one second, then release for three seconds. Repeat these steps
until unit starts pumping fluid.
Step 4 – Tighten the check valve plug.
D
E
M
I
R
P
E
B
D
L
U
O
H
S
T
I
N
U
R
E
W
O
P
R
U
O
Y
Содержание 4P9DXL
Страница 1: ...Jan 2017 Four Post Lift 9 000 lbs Capacity 4 500 lbs per axle INSTALLATION OWNERS MANUAL ATD 4P9DXL...
Страница 4: ...ATD 4P9DXL_rev_0318 FLOOR PLAN LAYOUT ATD 4P9DXL...
Страница 22: ...ATD4P9DXL_rev_0318...
Страница 23: ...ATD4P9DXL_rev_0318...
Страница 24: ...ATD4P9DXL_rev_0318...