16. Begin cable routing installation to Column Top Caps by first ensuring the pre-installed steel
Cables are properly routed around each Cable Sheave and are not in a bind.
Note: if
Cable(s) comes off the Cable Sheave, it will be required to remove the Cable Sheave
assembly to reinstall the Cable, due to welded cable guide brackets.
17. Pull the slack for each Cable from the corner ends of the Mainside Runway and route the
appropriate Cable(s) to each Column Top Caps, while ensuring that the Plastic Cable Pulley
(#95) is between the Cable and the Lock Ladder as shown in Fig.7. This will allow the
secondary Slack Cable Lock to function properly. See Fig.7 below for Cable routing
installation.
Fig. 7
Plastic Cable
Pulley
Nylon Lock Nut
& Washer
Содержание 4P9DXL
Страница 1: ...Jan 2017 Four Post Lift 9 000 lbs Capacity 4 500 lbs per axle INSTALLATION OWNERS MANUAL ATD 4P9DXL...
Страница 4: ...ATD 4P9DXL_rev_0318 FLOOR PLAN LAYOUT ATD 4P9DXL...
Страница 22: ...ATD4P9DXL_rev_0318...
Страница 23: ...ATD4P9DXL_rev_0318...
Страница 24: ...ATD4P9DXL_rev_0318...