ATD Tools 4P9DXL Скачать руководство пользователя страница 15

ATD4P9DXL_rev_0318

FOUNDATION and ANCHORING REQUIREMENTS 

1.  Concrete shall have compression strength of at least 3,000 PSI and a minimum thickness of 4-1/4” in order to 

achieve a minimum anchor embedment of 3-1/4”.  NOTE: When using the standard supplied 3/4” x 5-1/2” long 
anchors, if the top of the anchor exceeds 2-1/4” above the floor grade, you DO NOT have enough embedment.  

2.  Maintain a 6” minimum distance from any slab edge or seam.  Hole to hole spacing should be a minimum 6-1/2” 

in any direction.  Hole depth should be a minimum of 4-1/4”.  

3.  DO NOT install on asphalt or other similar unstable surface.  Columns are supported only by anchoring to floor.  

4.  Using the horseshoe shims provided, shim each column base as required until each column is plumb. If one 

column has to be elevated to match the plane of the other column, full size base shim plates should be used. 
Torque anchors to 130 ft-lbs.  Shim thickness MUST NOT exceed 1/2” when using the 5-1/2” long anchors 
provided with the lift.  

5.  If anchors do not tighten to 130 ft-lbs. installation torque, replace the concrete under each column base with a     

2’ x 2’ x 6” thick 3,000 PSI minimum concrete pad keyed under and flush with the top of existing floor.  Allow 
concrete to cure before installing lifts and anchors (typically 2 to 3 weeks).  

ANCHORING TIPS 

1.  Use a concrete hammer drill with a carbide tip, solid drill bit the same diameter as the anchor, 3/4” -                 

(.775 to .787 inches diameter).  Do not use excessively worn bits or bits which have been incorrectly sharpened.  

2.  Keep the drill in a perpendicular line while drilling.  

3.  Let the drill do the work. Do not apply excessive pressure.  Lift the drill up and down occasionally to remove 

residue to reduce binding. 

4.  Drill the hole to depth of 2” deeper than the length of anchor.  NOTE: Drilling thru concrete (recommended) will 

allow the anchor to be driven thru the bottom of foundation if the threads are damaged or if the lift will need to be 
relocated.  

5.  For better holding power blow dust from the hole. 

6.  Place a flat washer and hex nut over threaded end of anchor, leaving the nut almost flush with the top of the 

anchor bolt. Carefully tap anchor into hole.  Do not damage threads.  Tap anchor into the concrete until nut and 
flat washer are against base plate.  Do not use an impact wrench to tighten!  Tighten the nut, two or three turns on 
average after the concrete has cured (28-day cure).  If the concrete is very hard only one or two turns may be 
required. 

Drill holes using 3/4” 

Clean hole.   

Run nut down just  

Tighten nut with 

carbide tipped 

below impact section  

Torque wrench to 

masonry drill bit per 

of bolt. Drive anchor  

130 ft.-lbs. 

ANSI standard 

into hole until nut and  

B94.12.1977 washer 

contact 

base. 

 

Содержание 4P9DXL

Страница 1: ...Jan 2017 Four Post Lift 9 000 lbs Capacity 4 500 lbs per axle INSTALLATION OWNERS MANUAL ATD 4P9DXL...

Страница 2: ...make note of any damage on the bill of lading 2 In case of freight damage call the truck line immediately and report the damage as a freight claim 3 IMPORTANT Make sure you have extra help or heavy d...

Страница 3: ...bmitted in writing to the factory for examination The user assumes full responsibility for any equipment damage personal injury or alteration of the equipment described in this manual or any subsequen...

Страница 4: ...ATD 4P9DXL_rev_0318 FLOOR PLAN LAYOUT ATD 4P9DXL...

Страница 5: ...floor is of questionable slope consider a survey of the site and or the possibility of pouring a new level concrete slab This lift is designed to be installed on a minimum of 4 thick 3000psi with ste...

Страница 6: ...ATD 4P9DXL OPTIONAL ACCESSORIES NOT SHOWN t RJ 45 Rolling Scissor Jack 4 500 lbs capacity Sub Runway Poly Caster Kit Crossbeam Jack Tool Tray Wheel Stop Column Power Unit Column Drip Trays Mainside Ru...

Страница 7: ...ware Box 2 While the Mainside Runway Fig 2 is upside down find the end of the Hydraulic Hose that is already connected to the Cylinder Locate hole on the side of the Mainside Runway 1 and install the...

Страница 8: ...our Columns from the shipping brackets and place the Power Unit Column 1 with mount bracket in the above chosen corner Arrange the other three Sub Columns 2 in the remaining corners 8 Unpack the Cross...

Страница 9: ...de each column After removing the top Nut from the Lock Ladder you are ready to install the Top Caps A B 10 65 on the columns 12 Be aware of the offset hole in column s Top Caps Arrange Top Caps so th...

Страница 10: ...ght until they are diagonally within 1 2 Note The variance will help in mounting the runways later 15 Lift and position each Runway into place and secure to top of Crossbeams with the provided Hex Bol...

Страница 11: ...ave assembly to reinstall the Cable due to welded cable guide brackets 17 Pull the slack for each Cable from the corner ends of the Mainside Runway and route the appropriate Cable s to each Column Top...

Страница 12: ...y routed through guide ring weldments located on the underside of the Mainside Runway Fig 8 19 Mount the Power Unit 8 to the Mainside Column with the attached mounting bracket using the Hardware provi...

Страница 13: ...ise lift off all locks until cables are supporting the lift Adjust the Cable s Nylon Lock Nut as shown in Fig 7 located on the top of each post until lift is level on crossbeams and runways This will...

Страница 14: ...m rails as shown on page 6 and on Fig 9 4 Install the four Pivot Pins 53 and Hairpin Cotter Pins 52 to secure Caster assembly to each Column 5 Lower the Lift confirming that the Caster assemblies enga...

Страница 15: ...ts and anchors typically 2 to 3 weeks ANCHORING TIPS 1 Use a concrete hammer drill with a carbide tip solid drill bit the same diameter as the anchor 3 4 775 to 787 inches diameter Do not use excessiv...

Страница 16: ...manual Use only manufacturer s recommended attachments ALWAYS WEAR SAFETY GLASSES Everyday eyeglasses only have impact resistant lenses they are not safety glasses SAFETY PROCEDURES Never allow unauth...

Страница 17: ...ther front nor rear heavy Raising Lift Push up switch to raise lift until runways clear the floor Stop and check for vehicle movement and vehicle weight distribution If secure raise to desired height...

Страница 18: ...e in operation Check safety latches for free movement and full engagement with rack Check hydraulic connections and hoses for leakage Check cables connections bends cracks and for loose fittings Check...

Страница 19: ...ickly while under a heavy load Lower the lift slowly under heavy loads Motor Hums and Will Not Run 1 Lift overloaded Remove excessive weight from lift WARNING The voltages used in the lift can cause d...

Страница 20: ...the check valve the flush plug to the left of the lowering valve Step 2 Using an Allen wrench and shop towel with shop towel in place to catch fluid loosen the check valve plug 2 turns to allow it to...

Страница 21: ...t will travel full height You should hear the locking latches click through all latch slots simultaneously 3 Lower lift onto top latch position 4 Check clearance starting with the right front column u...

Страница 22: ...ATD4P9DXL_rev_0318...

Страница 23: ...ATD4P9DXL_rev_0318...

Страница 24: ...ATD4P9DXL_rev_0318...

Страница 25: ...a l F 7 1 0 X D K 9 P F 7 1 6 1 m m 0 3 x 2 1 M w e r c S 8 1 0 X D K 9 P F 8 1 19 FP9KDX 019 KY 8440T 1000 8 Foot Step 1 20 FP9KDX 020 KY 8440T 3000 24 Drip Board Cover A 1 21 FP9KDX 021 KY 8440T 300...

Страница 26: ...8 FP9KDX 058 KY 8440T 3000 11 Cylinder Pin 1 2 m m 0 4 x 4 M n i P r e t t o C 9 5 0 X D K 9 P F 9 5 60 FP9KDX 060 KY 8440T 6000 2 Hose B 78 15 1 61 FP9KDX 061 P35BBD 6004 90 Hydra Fitting 1 62 FP9KDX...

Страница 27: ...8440T 2000 13 Latch Shaft 4 91 FP9KDX 091 KY 8440T 2000 9 Slack Cable Latch B 4 92 FP9KDX 092 KY 8440T 2000 12 1 Latch Shaft Spacer 4 93 FP9KDX 093 KY 8440T 2000 11 Spring Slack Cable 8 94 FP9KDX 094...

Страница 28: ...is not considered a warranty issue and therefore must be noted for any potential recovery with the shipping company The customer is required to notify Tuxedo of any missing parts within 72 hours Timel...

Отзывы: