ATB AQUAMAX PRO G Скачать руководство пользователя страница 4

Operating instructions AQUAMAX

®

 PRO G

 

ATB WATER GmbH, Südstraße 2, D-32457 Porta Westfalica, www.atbwater.com / 
Art.-No.: 9060 0272 / Status: 24 February 2021 / Page 4 from 36

 

Dear customer, 

at this point we would like to thank you for the trust which you have shown in us by the purchase of 
this product. 
 
On the following pages you will find everything necessary about the installation, operation and 
maintenance requirements of your AQUAMAX

®

 small wastewater treatment plant. 

 
Please note that the careful installation of the wastewater treatment plant and the later 
maintenance are very important for a good treatment performance. 
 
Regular maintenance is laid down by the authorities. Through the conclusion of a maintenance 
contract the plant and its biological discharge values are monitored continuously. 
 
 
 

General and safety information 

 
With the AQUAMAX

®

 one is concerned with a technical system which, together with a multi-

chamber, can be employed as small wastewater treatment plant for the aerobic biological 
treatment of domestic and comparable wastewater of up to 8 m³/d from individual or several 
buildings, collected using a separate system. Dimensioning, configuration and operation are to 
take place in accordance with DIN EN 12566-3 and the approval of the German Institute for 
Structural engineering (DIBt)! 
 
With employment according to regulations no hazards whatsoever emanate from the plant. If the 
AQUAMAX

®

 is used for other employment purposes without the express approval of ATB WATER 

GmbH and/or if the following safety information is disregard, this can lead to the hazarding or injury 
of persons and to malfunctions of or defects in the plant. In this case every liability is excluded. 
Modifications to the plant or unauthorised conversions are not permitted. 
 
The AQUAMAX

®

 and accessories are not intended to be used by persons (including children) with 

limited physical, sensory or mental capabilities or without experience and/or knowledge, unless 
they are supervised by a person responsible for their safety or receive from him/her instruction on 
how to use the AQUAMAX

®

 and accessories. Children are to be supervised in order that they do 

not play with these. 
 
Before use the AQUAMAX

®

 is to be installed correctly and in agreement with the installation 

instruction. Installation instructions, operation and maintenance instructions are to be read careful 
before assembly and commissioning and the instructions contained therein must be followed 
implicitly. 
With assembly and installation, commissioning and operation as well as, if necessary, 
decommissioning, the customary national standard specifications and provisions are to be 
observed. All tasks may be carried out by trained and qualified specialists with an appropriate 
certificate of qualification only. The operator of the plant is to be instructed by the service 
technician. 
 
With the connection of the control system the national applicable provisions as well as the details 
on the specification plate are to be observed (mains voltage, frequency etc.). The equipment is to 
be operated only on network configurations which include a protective earth (PE) conductor. 

Attention is to be paid to correct phase connection (even with ready-to-plug 
configurations)!

 Connection to the mains must be by means of separate fusing and earth leakage 

circuit breaker (ELCB). Before commissioning the faultless function of the electrical safety 
measures must be checked!  
 
 
 

Содержание AQUAMAX PRO G

Страница 1: ...Innovations for clean water AQUAMAX PRO G Operating Instructions...

Страница 2: ...Operating instructions AQUAMAX PRO G ATB WATER GmbH S dstra e 2 D 32457 Porta Westfalica www atbwater com Art No 9060 0272 Status 24 February 2021 Page 2 from 36...

Страница 3: ...bly 11 Commissioning 12 Display information Main menu Logbook 13 Settings 15 Service mode 16 Manual mode Info Date time 21 Language Error reset 22 List of pre programmed parameters current limits 23 P...

Страница 4: ...nd to malfunctions of or defects in the plant In this case every liability is excluded Modifications to the plant or unauthorised conversions are not permitted The AQUAMAX and accessories are not inte...

Страница 5: ...e removed easily from the pit If the plant has to be entered then this fundamentally may take place only with the presence of a second person Particular care is to be taken The applicable accident pre...

Страница 6: ...6 hours the aeration phase ends and the settling phase begins After a settling time of 1 5 hours the treated wastewater is pumped off with the clear water pump The switch off point of the pump is set...

Страница 7: ...rvals and should maintained by a specialist for example twice a year Both are important for the proper operation of the systems Depending on capacity utilization the sludge is removed once a year or a...

Страница 8: ...al can be extended by the CW follow up time The excess sludge removal takes place in the series PRO G during the treatment phase and in the series PRO XL after the follow up time or after the clear wa...

Страница 9: ...ng takes place Flushing pulses To keep pumps free from sludge and to have a short operation during longer downtimes the charging clear water and sludge pumps are automatically switched on for the time...

Страница 10: ...ne aerator and one mixer two charging two clear water pumps one sludge pump one UV disinfection plant one system for phosphate precipitation and four float switches for level indication Equipment char...

Страница 11: ...The pluggable relays may have loosened during transport This must be checked before commissioning ATTENTION Before opening the proControl 2 and or the connection box these MUST be disconnected from t...

Страница 12: ...important for the correct entries in the logbook Use the keys to select the type of plant and confirm with OK Use the keys to select the PT size of the plant and confirm with OK Important for the cor...

Страница 13: ...d possible existing errors on the bottom line 1 for closed float switch 0 for opened float switch 1 position SW1 SBR minimum level HW min 2 position SW2 SBR maximum level HW max PRO only 3 position SW...

Страница 14: ...a USB stick To do this loosen the 4 screws of the display cover not the terminal box open the cover carefully ATTENTION Connecting cable turn it over and insert the USB stick into the corresponding s...

Страница 15: ...in service mode only There you will also find a description of each parameter Current limits Preset current limits A change of the default values ispossible in service mode only Alarm pause If within...

Страница 16: ...with the last deni phase before the settling phase Other inputs are not checked for plausibility In this case ATB WATER GmbH excludes any warranty The individual parameters are presented to you on th...

Страница 17: ...s time display 1 0 an alarm message will be generated SL removal Duration of the excess sludge removal Occurs immediately after an aeration CLASSIC BASIC PRO G or at the end of a cycle PRO XL Only if...

Страница 18: ...ses for one cycle deniphase not in the XLA system Duration of the denitrification phase begins with a feeding but is independent of it deni aer ON OFF not in the XLA XLAM Setting for the intermittent...

Страница 19: ...tting of these parameters is carried out in separate menu items Current limits With the current limits the allowable range between minimum and maximum current is set Current values outside of Imin Ima...

Страница 20: ...e UV lamp has reached the end of its service life default setting 8000 h a warning appears on the display Please inform the maintenance company so that the lamp can be replaced during the next mainten...

Страница 21: ...f a unit has triggered an error due to overcurrent consumption it can be taken into operation only after resetting this error see troubleshooting The manual mode is independent of the switching status...

Страница 22: ...acknowledge the acoustic indication plus the optional alarm of the potential free contact The error message on the display will continue and will be cancelled only after deleting the error delete OK...

Страница 23: ...0 10 10 10 10 10 10 10 10 10 deni aer OFF 0 120 min 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 info nitri duration calculated min 83 83 83 83 83 82 81 80 76 73 71 68 65 62 60 57 55 53 52...

Страница 24: ...ages on the display acustic alarm A1 aerator 1 A2 aerator 2 mixer F1 feeding pump 1 F2 feeding pump 2 C1 clear water pump 1 C2 clear water pump 2 SL sludge pump UV UV lamp P P precipitation Under curr...

Страница 25: ...ed so that the connection is broken Call service or electrician to check the contact points and the wiring The cable connection is broken See above CW timeout The clear water evacuation takes longer t...

Страница 26: ...trol unit is not properly tightened so that the connection is interrupted Call service or electrician to check the contact points and the wiring The cable connection is broken See above UVS Audible al...

Страница 27: ...for networking of multiple control units USB Host for software update and data exchange RS232 for remote data transmission e g via modem 2 x potential free contact max 250V AC 5A 4 x monitoring relay...

Страница 28: ...DC S1 G Float switch SW1 Phase Ground S2 G Float switch SW2 Phase Ground S3 G Float switch SW3 Phase Ground S4 G Float switch SW4 Phase Ground US G UV sensor Phase Ground PL G Precipitant level contro...

Страница 29: ...SB stick is inserted in the control board display screens can be saved on the stick as a screen shot in BMP format To do this loosen the 4 screws of the display cover not the terminal box open the cov...

Страница 30: ...mum filling level of 70 of the useful volume Implementation of general cleaning tasks such as for example removal of deposits removal of foreign bodies Examination of the structural condition of the p...

Страница 31: ...unusually high The control system indicates Flooding Alarm Unusually high infiltration inflow With heavy rainfall due to surface water or sodden earth through leaking concrete tanks Infiltration wate...

Страница 32: ...e electrical unit concerned The unit or the complete AQUAMAX is not connected to the control system Connect the appropriate unit A screwed terminal in the cable distribution box or on the terminal boa...

Страница 33: ...tor leaks in the tank introduction of too large quantities of cleaning or disinfection agents as well as other banned substances paints solvents etc sludge disposal not carried out incorrect setting o...

Страница 34: ...ctive on machinery 2014 30 EU Directive to electromagnetic compatibility 2014 35 EU Directive to electrical equipment designed for use within certain voltage limits 305 2011 Construction products Regu...

Страница 35: ......

Страница 36: ...Operating Instructions AQUAMAX PRO G oCE Art No 9060 0272 Status 24 February 2021...

Отзывы: