
Operating instructions AQUAMAX
®
PRO G
ATB WATER GmbH, Südstraße 2, D-32457 Porta Westfalica, www.atbwater.com /
Art.-No.: 9060 0272 / Status: 24 February 2021 / Page 19 from 36
eco aer. ON /OFF
Setting parameter for the intermittent aeration during
eco mode.
run in phase
For the displayed time no excess sludge removal is
carried out. In the first weeks of treatment plant
operation, the activated sludge must arise. During this
period the sludge removal is not useful. Depending on
the type of plant the parameter is 0 days (for XL) or
180 days for (BASIC/CLASSIC/PRO G).
info P-precipit. / disinfection
Info display if phosphate precipitation and UV
disinfection is active or not. The setting of these
parameters is carried out in separate menu items.
Current limits
With the current limits the allowable range between minimum and maximum
current is set. Current values outside of Imin - Imax lead to corresponding
over- or undercurrent alarms.
If the current consumption is below the minimum value, the unit will
continue to be controlled. If you carry out no error reset (only
acknowledged by OK) the same error will not cause an error message
for the next 72 hours!
If the current consumption is higher than the maximum value the
control of the unit is blocked until the error reset is done (automatic
reset after 72 hours).
Test run (see commissioning)
Note: Test run during settling phase may have the consequence that with
next clear water evacuation activated sludge is pumped out.
Serial number (see commissioning)
S
S
E
E
R
R
V
V
I
I
C
C
E
E
M
M
O
O
D
D
E
E