Commissioning 

 
With the first initiation of the control unit basic settings and tests are carried out. By entering the 
plant size all important parameters are preset. However, we recommend, after commissioning to 
enter “settings” and check the parameters again.  
In the Service Mode you also have subsequently the opportunity to make changes. 
 

Use the ↑↓-keys to select the desired language for the menus and display 
and press OK. Available are English, German, French, Spanish, Romanian, 
Polish, Italian. 
 

 

With the input of the service code it is ensured that the commissioning is 
carried out by a speciakist. Enter the 6 - digit code number using ↑ ↓ and 

OK

.  

 
 
 

Enter the data for date (display = dd.mm.yyyy) and time (display = 
hh:mm:ss). Warning: the date of commissioning cannot be changed 
later. 
This is important for the correct entries in the logbook! 

 

 
Use the ↑↓-keys to select the type of plant and confirm with 

OK

 
 

 

Use the ↑↓-keys to select the PT size of the plant and confirm with 

OK

Important for the correct preset parameters! 
 

 

Enter the serial number which is located on the AQUAMAX

®

 frame (BASIC / 

CLASSIC / PRO G ) or inside the outdoor cabinet or on the mounting plate of 
the control (PRO XL). Not the serial number of the control unit! 
Please make sure to enter the serial number right justified. 
 
 
With the confirmation of “new plant” to suppress sludge recirculation for the 
duration of run-in phase (preset to 180 days for BASIC, CLASSIC and PRO 
G). 
 
Click 

OK

 to start the test run (with ↑↓ 

OK

 and you can cancel the operation 

and exit the menu item). Here all active outputs are sequentially switched ON 
for about 5 seconds. Error messages are generated by current consumption 
outside the preset current limits. 
 
Furthermore, function and allocation of the float switches will verify. 
Test run can be restarted by moving any float switch. 

 
 

In the case of wrong settings, the commissioning may finally restart by 
entering “no”. Confirm the correct entries with 

OK.

  

 
 
 

 

Содержание AQUAMAX PRO G

Страница 1: ...Innovations for clean water AQUAMAX PRO G Operating Instructions...

Страница 2: ...Operating instructions AQUAMAX PRO G ATB WATER GmbH S dstra e 2 D 32457 Porta Westfalica www atbwater com Art No 9060 0272 Status 24 February 2021 Page 2 from 36...

Страница 3: ...bly 11 Commissioning 12 Display information Main menu Logbook 13 Settings 15 Service mode 16 Manual mode Info Date time 21 Language Error reset 22 List of pre programmed parameters current limits 23 P...

Страница 4: ...nd to malfunctions of or defects in the plant In this case every liability is excluded Modifications to the plant or unauthorised conversions are not permitted The AQUAMAX and accessories are not inte...

Страница 5: ...e removed easily from the pit If the plant has to be entered then this fundamentally may take place only with the presence of a second person Particular care is to be taken The applicable accident pre...

Страница 6: ...6 hours the aeration phase ends and the settling phase begins After a settling time of 1 5 hours the treated wastewater is pumped off with the clear water pump The switch off point of the pump is set...

Страница 7: ...rvals and should maintained by a specialist for example twice a year Both are important for the proper operation of the systems Depending on capacity utilization the sludge is removed once a year or a...

Страница 8: ...al can be extended by the CW follow up time The excess sludge removal takes place in the series PRO G during the treatment phase and in the series PRO XL after the follow up time or after the clear wa...

Страница 9: ...ng takes place Flushing pulses To keep pumps free from sludge and to have a short operation during longer downtimes the charging clear water and sludge pumps are automatically switched on for the time...

Страница 10: ...ne aerator and one mixer two charging two clear water pumps one sludge pump one UV disinfection plant one system for phosphate precipitation and four float switches for level indication Equipment char...

Страница 11: ...The pluggable relays may have loosened during transport This must be checked before commissioning ATTENTION Before opening the proControl 2 and or the connection box these MUST be disconnected from t...

Страница 12: ...important for the correct entries in the logbook Use the keys to select the type of plant and confirm with OK Use the keys to select the PT size of the plant and confirm with OK Important for the cor...

Страница 13: ...d possible existing errors on the bottom line 1 for closed float switch 0 for opened float switch 1 position SW1 SBR minimum level HW min 2 position SW2 SBR maximum level HW max PRO only 3 position SW...

Страница 14: ...a USB stick To do this loosen the 4 screws of the display cover not the terminal box open the cover carefully ATTENTION Connecting cable turn it over and insert the USB stick into the corresponding s...

Страница 15: ...in service mode only There you will also find a description of each parameter Current limits Preset current limits A change of the default values ispossible in service mode only Alarm pause If within...

Страница 16: ...with the last deni phase before the settling phase Other inputs are not checked for plausibility In this case ATB WATER GmbH excludes any warranty The individual parameters are presented to you on th...

Страница 17: ...s time display 1 0 an alarm message will be generated SL removal Duration of the excess sludge removal Occurs immediately after an aeration CLASSIC BASIC PRO G or at the end of a cycle PRO XL Only if...

Страница 18: ...ses for one cycle deniphase not in the XLA system Duration of the denitrification phase begins with a feeding but is independent of it deni aer ON OFF not in the XLA XLAM Setting for the intermittent...

Страница 19: ...tting of these parameters is carried out in separate menu items Current limits With the current limits the allowable range between minimum and maximum current is set Current values outside of Imin Ima...

Страница 20: ...e UV lamp has reached the end of its service life default setting 8000 h a warning appears on the display Please inform the maintenance company so that the lamp can be replaced during the next mainten...

Страница 21: ...f a unit has triggered an error due to overcurrent consumption it can be taken into operation only after resetting this error see troubleshooting The manual mode is independent of the switching status...

Страница 22: ...acknowledge the acoustic indication plus the optional alarm of the potential free contact The error message on the display will continue and will be cancelled only after deleting the error delete OK...

Страница 23: ...0 10 10 10 10 10 10 10 10 10 deni aer OFF 0 120 min 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 info nitri duration calculated min 83 83 83 83 83 82 81 80 76 73 71 68 65 62 60 57 55 53 52...

Страница 24: ...ages on the display acustic alarm A1 aerator 1 A2 aerator 2 mixer F1 feeding pump 1 F2 feeding pump 2 C1 clear water pump 1 C2 clear water pump 2 SL sludge pump UV UV lamp P P precipitation Under curr...

Страница 25: ...ed so that the connection is broken Call service or electrician to check the contact points and the wiring The cable connection is broken See above CW timeout The clear water evacuation takes longer t...

Страница 26: ...trol unit is not properly tightened so that the connection is interrupted Call service or electrician to check the contact points and the wiring The cable connection is broken See above UVS Audible al...

Страница 27: ...for networking of multiple control units USB Host for software update and data exchange RS232 for remote data transmission e g via modem 2 x potential free contact max 250V AC 5A 4 x monitoring relay...

Страница 28: ...DC S1 G Float switch SW1 Phase Ground S2 G Float switch SW2 Phase Ground S3 G Float switch SW3 Phase Ground S4 G Float switch SW4 Phase Ground US G UV sensor Phase Ground PL G Precipitant level contro...

Страница 29: ...SB stick is inserted in the control board display screens can be saved on the stick as a screen shot in BMP format To do this loosen the 4 screws of the display cover not the terminal box open the cov...

Страница 30: ...mum filling level of 70 of the useful volume Implementation of general cleaning tasks such as for example removal of deposits removal of foreign bodies Examination of the structural condition of the p...

Страница 31: ...unusually high The control system indicates Flooding Alarm Unusually high infiltration inflow With heavy rainfall due to surface water or sodden earth through leaking concrete tanks Infiltration wate...

Страница 32: ...e electrical unit concerned The unit or the complete AQUAMAX is not connected to the control system Connect the appropriate unit A screwed terminal in the cable distribution box or on the terminal boa...

Страница 33: ...tor leaks in the tank introduction of too large quantities of cleaning or disinfection agents as well as other banned substances paints solvents etc sludge disposal not carried out incorrect setting o...

Страница 34: ...ctive on machinery 2014 30 EU Directive to electromagnetic compatibility 2014 35 EU Directive to electrical equipment designed for use within certain voltage limits 305 2011 Construction products Regu...

Страница 35: ......

Страница 36: ...Operating Instructions AQUAMAX PRO G oCE Art No 9060 0272 Status 24 February 2021...

Отзывы: