CHAPTER 7. INDEX
Equipment Requirements, Patch Cord, 3-22
Equipment Room and Satellite Locations
E q u i p m e n t R o o m A p p l i c a t i o n s ,
66-Type/110-Type Hardware, 3-1
Equipment Room Cross-Connect Field, 4-20
Equipment Room Floor Plans, 3-13
Equipment Room Hardware and Cabling
Equipment Room Station Circuit
External Ringing, Installing, 4-63
F
F Clip Terminal Insulator, 2-22
F-61789 Power Adapter Cord, 2-20
FCC Registered Music Source, Installing, 5-19
FCC Registered Recorded Announcement
Floor Plans, Equipment Room, 3-13
Frame Mounting 110P-Type Terminal
G
Grounding, Coupled Bonding Conductor (CBC),
H
Hardware Changes
Hardware Satellite Location
Hardware Selection, Cross-Connect, 1-8
I
INADS Interface, Installing, 4-30
Individual Power Supplies, 2-47
Information Outlets, Installing, 4-10
Information Outlets Locations, 3-108
Information System Network Interface,
Initialization and Administration System
Installation and Administration, Jumper, 4-18
Installation and Administration, Patch
Installation—FCC Registered Music
Installation—Non-FCC Registered Music Source
Installing 3270 Data Modules, 5-33
Installing AP Interface—AT&T System 75
Installing Attendant Console, 4-24
Installing Audichron Wake-Up Announcement
Installing AUDIX Interface—V3 Only, 5-42
Installing CMS Interface—V3 Only, 5-42
Installing Colocated DS1 Tie Trunks, 4-33
Installing Customer-Provided Terminal Using
Installing Dial Dictation Equipment, 5-32
Installing Distributed Communications System
Installing Emergency Transfer Units and
Associated Voice Terminal, 4-40
Installing External Ringing, 4-63
Installing FCC Registered Recorded
Installing Information Outlets, 4-10
Installing ISN Interface, 5-49
Installing Loudspeaker Paging, 5-3
Installing Loudspeaker Paging Access—278A
Installing Loudspeaker Paging Access—89A
Installing Loudspeaker Paging With Background
7-4
Содержание System 75
Страница 1: ...AT T AT T System 75 and System 75 XE Wiring...
Страница 2: ...AT T AT T System 75 and System 75 XE Wiring 555 200 111 Issue 2 August 1989...
Страница 16: ...System Wiring Figure 1 2 System Uniform Wiring Plan 1 7...
Страница 17: ...CHAPTER 1 INTRODUCTION Figure 1 3 Sample Uniform Wiring Installation 1 8...
Страница 29: ...CHAPTER 2 HARDWARE 66 110 Type Figure 2 1 Block Diagram of System 75 or 75 XE Installation 2 2...
Страница 35: ...CHAPTER 2 HARDWARE 66 110 Type Figure 2 4 110A Type 100 Pair Terminal Block 2 8...
Страница 36: ...110 Type Hardware Description Figure 2 5 110A Type 300 Pair Terminal Block 2 9...
Страница 98: ...Typical System Equipment Room Floor Plans 3 15...
Страница 143: ...CHAPTER 3 EQUIPMENT ROOM DESIGN 3 60...
Страница 144: ...Equipment Room Hardware And Cabling Installation 3 61...
Страница 162: ...Equipment Room Hardware And Cabling Installation 3 79...
Страница 163: ...Equipment Room Hardware And Cabling Installation 3 80...
Страница 197: ...Tables Table 4 A Recommended Protectors 4 42 v...
Страница 203: ...CHAPTER 4 STATION WIRING Figure 4 4 3 Pair to 4 Pair Wiring Labeling From Equipment Room to Information Outlet 4 6...
Страница 205: ...CHAPTER 4 STATION WIRING Figure 4 5 4 Pair Station Wiring Labeling From Equipment Room to Information Outlet 4 8...
Страница 212: ...Adjunct Powering 4 15...
Страница 214: ...Adjunct Powering 4 17...
Страница 216: ...Patch Cord Jumper Installation And Administration 4 19...
Страница 241: ...CHAPTER 4 STATION WIRING 4 44...
Страница 244: ...Miscellaneous Wiring Installation 4 47...
Страница 246: ...Miscellaneous Wiring Installation 4 49...
Страница 252: ...Miscellaneous Wiring Installation 4 55...
Страница 254: ...Miscellaneous Wiring Installation 4 57...
Страница 277: ...CHAPTER 5 AUXILIARY EQUIPMENT INSTALLATION Figure 5 1 Connections for Loudspeaker Paging and Music on Hold 5 4...
Страница 314: ...CHAPTER 5 AUXILIARY EQUIPMENT INSTALLATION 5 41...
Страница 324: ...CHAPTER 5 AUXILIARY EQUIPMENT INSTALLATION 5 51...