Figure 3-53.
Figure 3-54.
Figure 3-55.
Figure 3-56.
Figure 3-59.
Figure 3-60.
Figure 3-61.
Figure 3-62.
Figure 3-63.
Figure 3-64.
Cable Routing From Switch Cabinet to
Cross-Connect Field (Using Bottom Terminal
Cable Routing Through Cable Slack
Manager—Single-Cabinet Installation (Using
Connectorized Top Terminal Blocks)
Cable Routing Through Cable Slack
Manager—Single-Cabinet Installation (Using
Connectorized Bottom Terminal Blocks)
Cable Routing Through Cable Slack
Manager—Single-Cabinet Installation (Using
66-Type Connecting Blocks With Cables Routed
From Top of Cross-Connect Field)
Cable Routing Through Cable Slack
Manager—Single-Cabinet Installation (Using
66-Type Connecting Blocks With Cables Routed
From Bottom of Cross-Connect Field)
Typical Port Cable Installation at Switch Cabinet
Control Carrier Outputs (AUXILIARY
Connector)—System 75
Control Carrier Outputs (AUXILIARY
Connector)—System 75 XE
System 75, Slot Addresses for 2-Carrier Cabinet
System 75, Slot Addresses for 5-Carrier Cabinet
System 75 XE Carrier Slot Addresses
Example of Establishing 3-Pair Modularity for Trunk
Pairs Used for 1-Pair Trunk Circuits; DID, Loop
Example of Establishing 3-Pair Modularity for Trunk
Pairs Used for 3-Pair Tie Trunks
Installing the Coupled Bonding Conductor
4-Pair Single Modular Plug-Ended Station Cable
Example of Extending 4-Pair Station Cables
258A and BR2580A Adapters
356A Adapter
4-Pair Circuit Distribution and Connectivity From
Equipment Room Cross-Connect Field
4-Pair Home Run to Equipment Room or Satellite
Location
-v-
Содержание System 75
Страница 1: ...AT T AT T System 75 and System 75 XE Wiring...
Страница 2: ...AT T AT T System 75 and System 75 XE Wiring 555 200 111 Issue 2 August 1989...
Страница 16: ...System Wiring Figure 1 2 System Uniform Wiring Plan 1 7...
Страница 17: ...CHAPTER 1 INTRODUCTION Figure 1 3 Sample Uniform Wiring Installation 1 8...
Страница 29: ...CHAPTER 2 HARDWARE 66 110 Type Figure 2 1 Block Diagram of System 75 or 75 XE Installation 2 2...
Страница 35: ...CHAPTER 2 HARDWARE 66 110 Type Figure 2 4 110A Type 100 Pair Terminal Block 2 8...
Страница 36: ...110 Type Hardware Description Figure 2 5 110A Type 300 Pair Terminal Block 2 9...
Страница 98: ...Typical System Equipment Room Floor Plans 3 15...
Страница 143: ...CHAPTER 3 EQUIPMENT ROOM DESIGN 3 60...
Страница 144: ...Equipment Room Hardware And Cabling Installation 3 61...
Страница 162: ...Equipment Room Hardware And Cabling Installation 3 79...
Страница 163: ...Equipment Room Hardware And Cabling Installation 3 80...
Страница 197: ...Tables Table 4 A Recommended Protectors 4 42 v...
Страница 203: ...CHAPTER 4 STATION WIRING Figure 4 4 3 Pair to 4 Pair Wiring Labeling From Equipment Room to Information Outlet 4 6...
Страница 205: ...CHAPTER 4 STATION WIRING Figure 4 5 4 Pair Station Wiring Labeling From Equipment Room to Information Outlet 4 8...
Страница 212: ...Adjunct Powering 4 15...
Страница 214: ...Adjunct Powering 4 17...
Страница 216: ...Patch Cord Jumper Installation And Administration 4 19...
Страница 241: ...CHAPTER 4 STATION WIRING 4 44...
Страница 244: ...Miscellaneous Wiring Installation 4 47...
Страница 246: ...Miscellaneous Wiring Installation 4 49...
Страница 252: ...Miscellaneous Wiring Installation 4 55...
Страница 254: ...Miscellaneous Wiring Installation 4 57...
Страница 277: ...CHAPTER 5 AUXILIARY EQUIPMENT INSTALLATION Figure 5 1 Connections for Loudspeaker Paging and Music on Hold 5 4...
Страница 314: ...CHAPTER 5 AUXILIARY EQUIPMENT INSTALLATION 5 41...
Страница 324: ...CHAPTER 5 AUXILIARY EQUIPMENT INSTALLATION 5 51...