CROSSS-CONNECT FIELD
POWER
CORD
Equipment Room Hardware And Cabling Installation
TRUNK/AUXILIARY
STATION DISTRIBUTION
BUILDING
CABLE SLACK
CABLE SLACK
CABLE SLACK
CABLES
MANAGER
MANAGER
MANAGER
NO. 1
NO. 2
NO. 3
SYSTEM
CABINET
(FRONT)
➀
CABLES RUN FROM SWITCH CABINET TO
TRUNK/AUXILIARY FIELD.
➁
CABLES RUN FROM SWITCH CABINET TO
STATION DISTRIBUTION FIELD.
Figure 3-45. Cable Routing From Switch Cabinet to Cross-Connect
Field (Using Bottom Terminal Blocks)
Routing Cables Using 110-Type Terminal Blocks
Figures 3-46 and 3-47 show the cable routing pattern through the cable
slack manager for a single cabinet installation using connectorized
110-type terminal blocks with the connectors located at the top and
bottom of the terminal blocks, respectively. Cables are routed through
the cable slack manager in either the cabinet or wall troughs. When
needed, the two center troughs can be used.
Port cables are routed through the cabinet trough for parallel runs.
Station cables should use the wall trough. After the cabinet and wall
troughs are filled, use the center trough.
3-67
Содержание System 75
Страница 1: ...AT T AT T System 75 and System 75 XE Wiring...
Страница 2: ...AT T AT T System 75 and System 75 XE Wiring 555 200 111 Issue 2 August 1989...
Страница 16: ...System Wiring Figure 1 2 System Uniform Wiring Plan 1 7...
Страница 17: ...CHAPTER 1 INTRODUCTION Figure 1 3 Sample Uniform Wiring Installation 1 8...
Страница 29: ...CHAPTER 2 HARDWARE 66 110 Type Figure 2 1 Block Diagram of System 75 or 75 XE Installation 2 2...
Страница 35: ...CHAPTER 2 HARDWARE 66 110 Type Figure 2 4 110A Type 100 Pair Terminal Block 2 8...
Страница 36: ...110 Type Hardware Description Figure 2 5 110A Type 300 Pair Terminal Block 2 9...
Страница 98: ...Typical System Equipment Room Floor Plans 3 15...
Страница 143: ...CHAPTER 3 EQUIPMENT ROOM DESIGN 3 60...
Страница 144: ...Equipment Room Hardware And Cabling Installation 3 61...
Страница 162: ...Equipment Room Hardware And Cabling Installation 3 79...
Страница 163: ...Equipment Room Hardware And Cabling Installation 3 80...
Страница 197: ...Tables Table 4 A Recommended Protectors 4 42 v...
Страница 203: ...CHAPTER 4 STATION WIRING Figure 4 4 3 Pair to 4 Pair Wiring Labeling From Equipment Room to Information Outlet 4 6...
Страница 205: ...CHAPTER 4 STATION WIRING Figure 4 5 4 Pair Station Wiring Labeling From Equipment Room to Information Outlet 4 8...
Страница 212: ...Adjunct Powering 4 15...
Страница 214: ...Adjunct Powering 4 17...
Страница 216: ...Patch Cord Jumper Installation And Administration 4 19...
Страница 241: ...CHAPTER 4 STATION WIRING 4 44...
Страница 244: ...Miscellaneous Wiring Installation 4 47...
Страница 246: ...Miscellaneous Wiring Installation 4 49...
Страница 252: ...Miscellaneous Wiring Installation 4 55...
Страница 254: ...Miscellaneous Wiring Installation 4 57...
Страница 277: ...CHAPTER 5 AUXILIARY EQUIPMENT INSTALLATION Figure 5 1 Connections for Loudspeaker Paging and Music on Hold 5 4...
Страница 314: ...CHAPTER 5 AUXILIARY EQUIPMENT INSTALLATION 5 41...
Страница 324: ...CHAPTER 5 AUXILIARY EQUIPMENT INSTALLATION 5 51...