CHAPTER 4. STATION WIRING
EQUIPMENT
SATELLITE
ROOM
LOCATION
SINGLE
ADMINISTRATION
POINT
PURPLE
WHITE
FIELD
FIELD
FIELD
INFORMATION
OUTLET
95
11OP6A 95
PATCH
CORD OR
JUMPERS
WHITE
BLUE
FIELD
95
11OP6A 95
PATCH
CORD OR
JUMPERS
Figure 4-12. 1-Point Administration
Equipment Room Cross-Connect Field
The following guidelines and procedures are provided for installing and
removing patch cords/jumper wires, and power adapter cords.
Administration details for changing system translations using the System
Access Terminal (SAT) are included in the System 75 And System 75
XE—Administration (555-200-500).
Installing Patch Cords/Jumper Wires
The DEFINITY™ Communications System and System 75, and System 85,
Terminals and Adjuncts, Installation and Tests (555-015-104) contains
installation procedures for telephones/voice terminals and adjuncts.
The telephones/voice terminals and adjuncts are installed before the
patch cords/jumper wires, and power adapter cords are connected.
The shortest patch cord/jumper wire should always be used to make a
cross-connection.
4-20
Содержание System 75
Страница 1: ...AT T AT T System 75 and System 75 XE Wiring...
Страница 2: ...AT T AT T System 75 and System 75 XE Wiring 555 200 111 Issue 2 August 1989...
Страница 16: ...System Wiring Figure 1 2 System Uniform Wiring Plan 1 7...
Страница 17: ...CHAPTER 1 INTRODUCTION Figure 1 3 Sample Uniform Wiring Installation 1 8...
Страница 29: ...CHAPTER 2 HARDWARE 66 110 Type Figure 2 1 Block Diagram of System 75 or 75 XE Installation 2 2...
Страница 35: ...CHAPTER 2 HARDWARE 66 110 Type Figure 2 4 110A Type 100 Pair Terminal Block 2 8...
Страница 36: ...110 Type Hardware Description Figure 2 5 110A Type 300 Pair Terminal Block 2 9...
Страница 98: ...Typical System Equipment Room Floor Plans 3 15...
Страница 143: ...CHAPTER 3 EQUIPMENT ROOM DESIGN 3 60...
Страница 144: ...Equipment Room Hardware And Cabling Installation 3 61...
Страница 162: ...Equipment Room Hardware And Cabling Installation 3 79...
Страница 163: ...Equipment Room Hardware And Cabling Installation 3 80...
Страница 197: ...Tables Table 4 A Recommended Protectors 4 42 v...
Страница 203: ...CHAPTER 4 STATION WIRING Figure 4 4 3 Pair to 4 Pair Wiring Labeling From Equipment Room to Information Outlet 4 6...
Страница 205: ...CHAPTER 4 STATION WIRING Figure 4 5 4 Pair Station Wiring Labeling From Equipment Room to Information Outlet 4 8...
Страница 212: ...Adjunct Powering 4 15...
Страница 214: ...Adjunct Powering 4 17...
Страница 216: ...Patch Cord Jumper Installation And Administration 4 19...
Страница 241: ...CHAPTER 4 STATION WIRING 4 44...
Страница 244: ...Miscellaneous Wiring Installation 4 47...
Страница 246: ...Miscellaneous Wiring Installation 4 49...
Страница 252: ...Miscellaneous Wiring Installation 4 55...
Страница 254: ...Miscellaneous Wiring Installation 4 57...
Страница 277: ...CHAPTER 5 AUXILIARY EQUIPMENT INSTALLATION Figure 5 1 Connections for Loudspeaker Paging and Music on Hold 5 4...
Страница 314: ...CHAPTER 5 AUXILIARY EQUIPMENT INSTALLATION 5 41...