CHAPTER 4. STATION WIRING
Patch Cord/Jumper Installation And
Administration
Before starting the patch cord installation, obtain a copy of the Port
Assignment Record forms (Figure 4-11) from the customer or marketing
representative. These forms contain the port assignments and identify
the extension numbers (Terminal No.) of the telephones/voice terminals.
Enter the jack assignments at the equipment room and indicate if
adjunct power is required and where it is provided (cross-connect field,
site/satellite closet, or information outlet).
When satellite locations are provided, enter the satellite letter
designation (A through F) and the jack appearance in the equipment
room on the form. Also, enter the floor designation and/or building
designation if appropriate. For 1-point administration (Figure 4-12), this
entry is all that is required. The white field number always corresponds
to the station jack number at the satellite location blue field.
For 2-point administration (Figure 4-13), the station jack numbers (blue
field) at the satellite locations must also be entered on the form. For
example, the entry A1-10 indicates satellite location A, white field
position 1 at the equipment room and the satellite location, and station
jack number 10 at the satellite location.
4-18
Содержание System 75
Страница 1: ...AT T AT T System 75 and System 75 XE Wiring...
Страница 2: ...AT T AT T System 75 and System 75 XE Wiring 555 200 111 Issue 2 August 1989...
Страница 16: ...System Wiring Figure 1 2 System Uniform Wiring Plan 1 7...
Страница 17: ...CHAPTER 1 INTRODUCTION Figure 1 3 Sample Uniform Wiring Installation 1 8...
Страница 29: ...CHAPTER 2 HARDWARE 66 110 Type Figure 2 1 Block Diagram of System 75 or 75 XE Installation 2 2...
Страница 35: ...CHAPTER 2 HARDWARE 66 110 Type Figure 2 4 110A Type 100 Pair Terminal Block 2 8...
Страница 36: ...110 Type Hardware Description Figure 2 5 110A Type 300 Pair Terminal Block 2 9...
Страница 98: ...Typical System Equipment Room Floor Plans 3 15...
Страница 143: ...CHAPTER 3 EQUIPMENT ROOM DESIGN 3 60...
Страница 144: ...Equipment Room Hardware And Cabling Installation 3 61...
Страница 162: ...Equipment Room Hardware And Cabling Installation 3 79...
Страница 163: ...Equipment Room Hardware And Cabling Installation 3 80...
Страница 197: ...Tables Table 4 A Recommended Protectors 4 42 v...
Страница 203: ...CHAPTER 4 STATION WIRING Figure 4 4 3 Pair to 4 Pair Wiring Labeling From Equipment Room to Information Outlet 4 6...
Страница 205: ...CHAPTER 4 STATION WIRING Figure 4 5 4 Pair Station Wiring Labeling From Equipment Room to Information Outlet 4 8...
Страница 212: ...Adjunct Powering 4 15...
Страница 214: ...Adjunct Powering 4 17...
Страница 216: ...Patch Cord Jumper Installation And Administration 4 19...
Страница 241: ...CHAPTER 4 STATION WIRING 4 44...
Страница 244: ...Miscellaneous Wiring Installation 4 47...
Страница 246: ...Miscellaneous Wiring Installation 4 49...
Страница 252: ...Miscellaneous Wiring Installation 4 55...
Страница 254: ...Miscellaneous Wiring Installation 4 57...
Страница 277: ...CHAPTER 5 AUXILIARY EQUIPMENT INSTALLATION Figure 5 1 Connections for Loudspeaker Paging and Music on Hold 5 4...
Страница 314: ...CHAPTER 5 AUXILIARY EQUIPMENT INSTALLATION 5 41...
Страница 324: ...CHAPTER 5 AUXILIARY EQUIPMENT INSTALLATION 5 51...