Equipment Room Hardware And Cabling Installation
Equipment Room Hardware And Cabling
Installation
Hardware Installation
The procedures, provided in this guide, for installing hardware are
written so that one system technician can do the installation. Procedures
are provided for installing the following:
●
●
●
●
Cross-connect field
Labels for cross-connect field
Installing the Cross-Connect Field
The preferred cross-connect field location is directly behind the switch
cabinet.
Wall Mounting 110A-Type Terminal Blocks
The 110A-type hardware can be stacked in almost any arrangement at
any height or location on the wall. One arrangement is shown in Figure
3-10. The distance between the mounting screw holes on the terminal
blocks is 10-13/16 inches. If a vertical patch cord trough is to used, the
distance between the mounting screw holes is 5-5/16 inches.
Wall Mounting 110P-Type Terminal Blocks
The first terminal block of the trunk/auxiliary field is aligned with the left
side of the switch cabinet (Figures 3-11 or 3-12). This arrangement
allows for growth on the right side of the cross-connect field.
To install the cross-connect field, proceed as follows:
1. If 300-pair terminal blocks are to be installed, draw a level horizontal
line on the wall 47-1/2 inches above the floor (Figure 3-14). If
900-pair terminal blocks are to be mounted, draw a level horizontal
line on the wall 23 inches above the floor (Figure 3-15).
3-25
Содержание System 75
Страница 1: ...AT T AT T System 75 and System 75 XE Wiring...
Страница 2: ...AT T AT T System 75 and System 75 XE Wiring 555 200 111 Issue 2 August 1989...
Страница 16: ...System Wiring Figure 1 2 System Uniform Wiring Plan 1 7...
Страница 17: ...CHAPTER 1 INTRODUCTION Figure 1 3 Sample Uniform Wiring Installation 1 8...
Страница 29: ...CHAPTER 2 HARDWARE 66 110 Type Figure 2 1 Block Diagram of System 75 or 75 XE Installation 2 2...
Страница 35: ...CHAPTER 2 HARDWARE 66 110 Type Figure 2 4 110A Type 100 Pair Terminal Block 2 8...
Страница 36: ...110 Type Hardware Description Figure 2 5 110A Type 300 Pair Terminal Block 2 9...
Страница 98: ...Typical System Equipment Room Floor Plans 3 15...
Страница 143: ...CHAPTER 3 EQUIPMENT ROOM DESIGN 3 60...
Страница 144: ...Equipment Room Hardware And Cabling Installation 3 61...
Страница 162: ...Equipment Room Hardware And Cabling Installation 3 79...
Страница 163: ...Equipment Room Hardware And Cabling Installation 3 80...
Страница 197: ...Tables Table 4 A Recommended Protectors 4 42 v...
Страница 203: ...CHAPTER 4 STATION WIRING Figure 4 4 3 Pair to 4 Pair Wiring Labeling From Equipment Room to Information Outlet 4 6...
Страница 205: ...CHAPTER 4 STATION WIRING Figure 4 5 4 Pair Station Wiring Labeling From Equipment Room to Information Outlet 4 8...
Страница 212: ...Adjunct Powering 4 15...
Страница 214: ...Adjunct Powering 4 17...
Страница 216: ...Patch Cord Jumper Installation And Administration 4 19...
Страница 241: ...CHAPTER 4 STATION WIRING 4 44...
Страница 244: ...Miscellaneous Wiring Installation 4 47...
Страница 246: ...Miscellaneous Wiring Installation 4 49...
Страница 252: ...Miscellaneous Wiring Installation 4 55...
Страница 254: ...Miscellaneous Wiring Installation 4 57...
Страница 277: ...CHAPTER 5 AUXILIARY EQUIPMENT INSTALLATION Figure 5 1 Connections for Loudspeaker Paging and Music on Hold 5 4...
Страница 314: ...CHAPTER 5 AUXILIARY EQUIPMENT INSTALLATION 5 41...
Страница 324: ...CHAPTER 5 AUXILIARY EQUIPMENT INSTALLATION 5 51...