CHAPTER 5. AUXILIARY EQUIPMENT INSTALLATION
lnstallation—FCC Registered Recorded Announcement Equipment
Install FCC registered recorded announcement equipment as follows:
1.
2.
3.
4.
5.
Determine feature port assignment from Announcement Form:
EXAMPLE: Port Number
B
0 2
01
Carrier Slot Circuit
Install recorded announcement equipment per the manufacturer’s
instructions.
Connect a 2-pair line cord (modular plug at one end) from the
information outlet to the music source (Figure 5-14).
Install patch cord/jumper wires at cross-connect field.
Administer per AT&T System 75 and System 75 XE—Implementation
( 5 5 5 - 2 0 0 - 6 5 1 ) a n d AT&T System 75 and System 75
XE—Adminstration (555-200-500).
lnstallation—Non-FCC Registered Recorded Announcement Equipment
Install the Non-FCC registered recorded announcement equipment as
follows:
1.
2.
3.
4.
Determine feature port assignment from Announcement Form:
EXAMPLE: Port Number
B
0 2
01
Carrier Slot Circuit
Identify carrier slot and place a label on both ends of an A25D
cable.
Connect the A25D cable from the station side of the cross-connect
field to a 25-pair connector on the auxiliary cabinet ED-1E443-10
intra-connection panel (Figure 5-14).
Connect an A25D (for 110-type hardware) or B25A (for 66-type
hardware) cable from the 25-pair connector on the ED-1E443-10
intra-connection panel to the switch side of the cross-connect field
(Figure 5-14).
5-25
Содержание System 75
Страница 1: ...AT T AT T System 75 and System 75 XE Wiring...
Страница 2: ...AT T AT T System 75 and System 75 XE Wiring 555 200 111 Issue 2 August 1989...
Страница 16: ...System Wiring Figure 1 2 System Uniform Wiring Plan 1 7...
Страница 17: ...CHAPTER 1 INTRODUCTION Figure 1 3 Sample Uniform Wiring Installation 1 8...
Страница 29: ...CHAPTER 2 HARDWARE 66 110 Type Figure 2 1 Block Diagram of System 75 or 75 XE Installation 2 2...
Страница 35: ...CHAPTER 2 HARDWARE 66 110 Type Figure 2 4 110A Type 100 Pair Terminal Block 2 8...
Страница 36: ...110 Type Hardware Description Figure 2 5 110A Type 300 Pair Terminal Block 2 9...
Страница 98: ...Typical System Equipment Room Floor Plans 3 15...
Страница 143: ...CHAPTER 3 EQUIPMENT ROOM DESIGN 3 60...
Страница 144: ...Equipment Room Hardware And Cabling Installation 3 61...
Страница 162: ...Equipment Room Hardware And Cabling Installation 3 79...
Страница 163: ...Equipment Room Hardware And Cabling Installation 3 80...
Страница 197: ...Tables Table 4 A Recommended Protectors 4 42 v...
Страница 203: ...CHAPTER 4 STATION WIRING Figure 4 4 3 Pair to 4 Pair Wiring Labeling From Equipment Room to Information Outlet 4 6...
Страница 205: ...CHAPTER 4 STATION WIRING Figure 4 5 4 Pair Station Wiring Labeling From Equipment Room to Information Outlet 4 8...
Страница 212: ...Adjunct Powering 4 15...
Страница 214: ...Adjunct Powering 4 17...
Страница 216: ...Patch Cord Jumper Installation And Administration 4 19...
Страница 241: ...CHAPTER 4 STATION WIRING 4 44...
Страница 244: ...Miscellaneous Wiring Installation 4 47...
Страница 246: ...Miscellaneous Wiring Installation 4 49...
Страница 252: ...Miscellaneous Wiring Installation 4 55...
Страница 254: ...Miscellaneous Wiring Installation 4 57...
Страница 277: ...CHAPTER 5 AUXILIARY EQUIPMENT INSTALLATION Figure 5 1 Connections for Loudspeaker Paging and Music on Hold 5 4...
Страница 314: ...CHAPTER 5 AUXILIARY EQUIPMENT INSTALLATION 5 41...
Страница 324: ...CHAPTER 5 AUXILIARY EQUIPMENT INSTALLATION 5 51...