Gebrauchsanweisung LIANA
| Version 1.0
Seite 34 von 50
14. MAINTENANCE, STK AND SERVICING
For safe use of the LIANA patient sitting/standing stabilisation aid and for the protection of users and patients, the
product must undergo regular inspections and maintenance as well as an annual safety inspection. This includes,
among other things, visual inspection for external damage (housing, mains connections, legible labelling,
contamination, etc.) as well as availability and completeness of the documents.
The performance of the safety inspections and maintenance must be documented and proven upon request. Use
your inventory to do this.
Inspections, maintenance and checks may only be carried out by trained, qualified specialists authorised by the
manufacturer who meet the requirements of the MPBetreibV (Medical Devices Operator Ordinance). Outside
Germany, please observe the respective national legislation. Failure to do so may result in injury or an unsafe
product.
In case of doubt, please contact your supplier or the manufacturer.
NOTE
According to the accident prevention regulations (UVV) of the Employer's Liability Insurance Association,
the DGUV Regulation 3 (DGUV V3) test must be carried out annually on the product for portable devices
used in operating sites, rooms and systems of a special nature (DIN VDE 0100 Group 700).
This DGUV test is only mandatory for Germany. Other countries may have different regulations that must be
observed.
WARNING
Do not perform any cleaning, maintenance or testing activities when the product is in use. This may result in
a hazard for the user and the patient.
Installation, maintenance, servicing and testing activities are only permitted if the patient is not present.
Clean and disinfect the product daily.
Perform a visual inspection of all components, power cables and connections weekly. In addition, perform a function
test and clean the castors if necessary.
Carry out maintenance, a safety inspection and testing in accordance with DGUV Regulation 3 annually.
14.1. Tests before each use
To ensure safe and trouble-free operation, the following checks must be carried out before each use:
▪
Visual inspection of the unit (external damage and wear).
▪
Check whether any screws are missing or loose on the device.
▪
Check the function of the device.
▪
Check the function of the horizontal extension/retraction.
▪
Check the function of the vertical extension/retraction.
▪
Check the function of the wired remote control (up/down/forwards/backwards).
▪
Check the function of the integrated column keypad (up/down/forwards/backwards).
▪
Check the safety switch.
▪
Check that the castors are running smoothly.
▪
Check the stabilisation straps for damage.
▪
Check the function of all detents.
▪
Check the charge level of the battery.
Содержание motioncare LIANA
Страница 15: ...Gebrauchsanweisung LIANA Version 1 0 Seite 15 von 50 7 1 Product dimensions...
Страница 39: ...Gebrauchsanweisung LIANA Version 1 0 Seite 39 von 50 21 ELECTRICAL DIAGRAM...
Страница 40: ...Gebrauchsanweisung LIANA Version 1 0 Seite 40 von 50...
Страница 42: ...Gebrauchsanweisung LIANA Version 1 0 Seite 42 von 50 23 CE DECLARATION OF CONFORMITY PSS LIANA...
Страница 50: ...Gebrauchsanweisung LIANA Version 1 0 Seite 50 von 50...