Reference
81
Ref
eren
ce
DataLogging Setup Screen (LGST)
Use the DATALOGGING screen, Figure 4.11, to set the recording interval and
recording time for a point.
Table 4.11 describes the DATALOGGING screen fields.
Figure 4.11: Datalogging Setup Screen (LGST)
Table 4.11: Datalogging Setup Screen Field Descriptions
Field
Description
INTERVAL
Recording interval used for point, line, and area feature data
collection. Changing the recording interval creates a new file in the
receiver. Default: 2.0 seconds.
TIME ON POINT
Point occupation time . Period of logging for a point feature. The
maximum time on point is 999 epochs or 60 minutes, whichever is
smaller. Default is 0.33 minute.
DFLT
Reverts to default interval and time on point time values.
CNCL
Returns to GIS MAIN MENU disregarding any changes.
OK
Returns to GIS MAIN MENU accepting the current settings.
Содержание Reliance FS/2
Страница 2: ...ii Reliance with FS 2 Field Operations Manual FS 2 Screen Map...
Страница 6: ...vi Reliance with FS 2 Field Operations Manual...
Страница 14: ...xiv Reliance with FS 2 Field Operations Manual...
Страница 26: ...10 Reliance with FS 2 Field Operations Manual...
Страница 150: ...134 Reliance with FS 2 Field Operations Manual...
Страница 158: ...B 4 Reliance with FS 2 Field Operations Manual...
Страница 160: ...C 2 Reliance with FS 2 Field Operations Manual Figure C 1 FS 2 Handheld Controller...
Страница 170: ...C 12 Reliance with FS 2 Field Operations Manual...
Страница 176: ...E 4 Reliance with FS 2 Field Operations Manual...
Страница 182: ...F 6 Reliance with FS 2 Field Operations Manual...