F
ie
ld
O
p
erat
ion
Field Operation
23
3
Field Operation
The following instructions show you how to set up, configure, and use the Reliance
system in a typical GIS data collection session.
Field Checklist
Before leaving the office to collect GIS data, check the following:
1.
FS/2 batteries charged
2.
FS/2 power management configured
3.
Receiver batteries charged
4.
Receiver battery management configured
5.
Feature and waypoint files uploaded to FS/2
6.
Correct interval entered on datalogging screen for rover
7.
Correct interval used on base station
8.
Base station recording
9.
RTCM broadcasting (if using differential mode)
After completing GIS data collection, check the following:
1.
Receiver off
2.
Exit FAMlog
3.
FS/2 off
4.
Base station recording stopped
Equipment Connections
To connect the equipment:
1.
Install GPS receiver and batteries into the backpack.
2.
Identify the interface cable, (Figure 1.5). Connect the 25-pin connector to the
serial port of the receiver.
3.
Connect the circular 12-pin connector to Port 1 of the FS/2 and the other end to
Port A on the interface cable.
4.
Connect one end of the antenna cable to the ANT connector on the receiver.
Connect the other end of the antenna cable to the antenna. The antenna may be
Содержание Reliance FS/2
Страница 2: ...ii Reliance with FS 2 Field Operations Manual FS 2 Screen Map...
Страница 6: ...vi Reliance with FS 2 Field Operations Manual...
Страница 14: ...xiv Reliance with FS 2 Field Operations Manual...
Страница 26: ...10 Reliance with FS 2 Field Operations Manual...
Страница 150: ...134 Reliance with FS 2 Field Operations Manual...
Страница 158: ...B 4 Reliance with FS 2 Field Operations Manual...
Страница 160: ...C 2 Reliance with FS 2 Field Operations Manual Figure C 1 FS 2 Handheld Controller...
Страница 170: ...C 12 Reliance with FS 2 Field Operations Manual...
Страница 176: ...E 4 Reliance with FS 2 Field Operations Manual...
Страница 182: ...F 6 Reliance with FS 2 Field Operations Manual...