Field Operation
57
F
ie
ld
O
p
erat
ion
10. Press F4 (RETN) to return to the GIS main menu. In the GIS main menu,
press Shift F2 (RCVR), calling the Receiver Setup screen, Figure 3.36.
11. In the Receiver Setup screen, press F2 (MODE), calling the Differential
Mode screen, Figure 3.37.
Figure 3.36: Receiver Setup Screen
Figure 3.37: Differenital Mode Screen
Содержание Reliance FS/2
Страница 2: ...ii Reliance with FS 2 Field Operations Manual FS 2 Screen Map...
Страница 6: ...vi Reliance with FS 2 Field Operations Manual...
Страница 14: ...xiv Reliance with FS 2 Field Operations Manual...
Страница 26: ...10 Reliance with FS 2 Field Operations Manual...
Страница 150: ...134 Reliance with FS 2 Field Operations Manual...
Страница 158: ...B 4 Reliance with FS 2 Field Operations Manual...
Страница 160: ...C 2 Reliance with FS 2 Field Operations Manual Figure C 1 FS 2 Handheld Controller...
Страница 170: ...C 12 Reliance with FS 2 Field Operations Manual...
Страница 176: ...E 4 Reliance with FS 2 Field Operations Manual...
Страница 182: ...F 6 Reliance with FS 2 Field Operations Manual...