Advanced Management
Page 4-24
if you require frames from VLANs 2 and 3 to cross the switches, the ports
should have the following configuration for both switches:
In this case, VLAN 2 and VLAN 3 are linked across the switches. However,
port 1 is not a member of VLAN 4, so frames from E-3 and E-4 cannot reach
E-7 and E-8. In other words, VLAN 4 is not linked across the switches. And
because port 1 accepts only tagged frames, any untagged frames from E-9 will
not cross from switch 2 to switch 1.
If you want VLAN 2 to pass frames to and from E-9, you need to configure the
ISL differently. For example, you could change port 1 on both switches as
follows:
In this case, if port 1 receives an untagged frame, it assigns the frame to VLAN
2. That means VLAN 2 will be flooded with frames from E-9.
On the other hand, when port 1 transmits a frame from VLAN 2, it removes
the tag. Since all the other ports accept untagged frames, those frames will flood
VLAN 3 on both switches, and VLAN 4 on the originating switch.
To see the menus and steps to configure an ISL, see “Configuring Inter-Switch
Links” on page 4-33
Port
Receive
Frame Type
Ingress
Filter
VLANs
Untagset
PVID
1
802.1Q - Only
Disabled
V2, V3
No
4095
2
All Frames
Disabled
V2
No
V2
3
All Frames
Disabled
V3
No
V3
4
All Frames
Disabled
V4
No
V4
5
All Frames
Disabled
V4
No
V4
6 (Sw 2)
All Frames
Disabled
V1 (Default)
Yes
V1
Port
Receive
Frame Type
Ingress
Filter
VLANs
Untagset
PVID
1
All Frames
Disabled
V3
No
V2
V2
Yes
Содержание IntraCore 6524
Страница 8: ...Page vi...
Страница 80: ...Configuration Page 3 52...
Страница 122: ...Advanced Management Page 4 42...
Страница 142: ...Web Browser Management Page 5 20...
Страница 144: ...Page A 2...
Страница 150: ...Page B 6...