The Foundation For Your Building
9
Foundation
BW9
Concrete Slab
The slab should be at least 4" (10cm) thick. It must be level and flat to provide good support for the frame.
The following are the recommended materials for your foundation.
●
2 x 4's (5cm x 10cm) (will be removed once the concrete cures)
●
Concrete
●
Sheet of 6 mil plastic
●
We recommend for a proper strength concrete to use a mix of:
1 part cement
●
3 parts pea sized gravel
●
2 1/2 parts clean sand
Prepare the Site/Construct a Foundation
1. Dig a square, 6" (15cm) deep into the ground (remove grass).
2. Fill up to 4" (10cm) in the square with gravel and tamp firm.
3. Cover gravel with a sheet of 6 mil plastic.
4. Construct a wood frame using four planks of 2x4 (5cm x 10cm)
lumber.
5. Pour in concrete to fill in the hole and the frame giving a
total of 4" (8-10cm) thick concrete. Be sure surface is level.
Allow 3 - 5 hours for construction and a week for concrete curing time.
Note: Before beginning construction, check local building codes
regarding footings, location and other requirements.
141 1/8"
3,58m
FRONT (ROLL-UP DOOR)
10' - 111 3/4"
2,84m
17' - 198"
5,03m
24' - 284 1/4"
7,22m
31' - 370 1/2"
9,41m
Note: Finished Slab dimensions, with lumber removed.
Reinforcing
Rods
Reinforcing
Rods
Optional Footer Type of Foundation
Welded Wire
Fabric