6
After removing the boiler from its packaging, remove the
template from the separate box containing the connection
kit. N
OTE
: Pay particular attention to any test water that
may spill from the appliance.
Place the template in the position the appliance is to be
mounted and after ensuring it is hanging squarely, use it
to mark the holes for the hanging bracket, connection kit
and flue pipe(s) NB: For further information relating to the
flue installation please refer to Section 2.9 F
L U E
C
ONNECTION
. (If the appliance is to be fitted on a wall of
combustible material, the wall must be protected by a
sheet of fireproof material).
If the appliance is to be fitted into a timber framed
building, guidance should be sought from the Institute of
Gas Engineers document R
EF
: IGE/UP/7.
2.5
M
OUNTING THE
A
PPLIANCE
F
IG
. 2.2
In order to allow access to the interior of the boiler for
maintenance purposes, the boiler must be installed in
compliance with the minimum clearances indicated in
F
IG
. 2.2
2.4
C
LEARANCES
120
L
EGEND
:
A = Central Heating Flow (3/4” - 22mm Copper Tail)
B = Domestic Hot Water Outlet (1/2” - 15mm Copper Tail)
C = Gas Inlet (3/4” - 15mm Copper Tail)
D = Domestic Cold Water Inlet (1/2” - 15mm Copper Tail)
E = Central Heating Return (3/4” - 22mm Copper Tail)
2.3
O
VERALL
D
IMENSIONS
F
IG
. 2.1
*
Clearance for Servicing 25mm if behind a temporary
closure i.e. door.
Содержание microGENUS HE 24 MFFI
Страница 20: ...20 Fig 2 22 NOTE DRAWINGS ARE INDICATIVE OF FLUEING OPTIONS ONLY TYPE 1 TYPE 5 TYPE 4 TYPE 3 TYPE 2 FIG 2 21...
Страница 68: ...68 10 BENCHMARK COMMISSIONING CHECKLIST...
Страница 69: ...69 11 SERVICE INTERVAL RECORD...
Страница 70: ...70...
Страница 71: ...71...