30
- If the boiler is installed in an existing system, any
unsuitable additives must be removed prior to the fitting
of the boiler;
- Under no circumstances should the boiler be fired
before the system has been thoroughly flushed; the
flushing procedure must be in line with BS7593:1992.
Firstly fill the central heating system and boiler with the
power off, flush through cold and completely drain the
system, fill the central heating system again, add a
flushing detergent, we highly recommend the use of a
flushing detergent appropriate for the metals used in
the circuit.
These include (Fer nox Superfloc,
BetzDearborn Sentinel X300 or X400), whose function
is to dissolve any foreign matter that may be in the
system, and run the boiler on central heating until it
reaches its operating temperature, flushand drain the
system completely, and refill the system with a suitable
corrosion inhibitor such as Fernox Copal MB-1, or
BetzDeaborn Sentinel X100 is recommended.
N
OTE
: F
AILURE TO CARRY OUT THE FLUSHING PROCEDURE WILL
RESULT IN THE WARRANTY BECOMING VOID
.
Содержание microGENUS HE 24 MFFI
Страница 20: ...20 Fig 2 22 NOTE DRAWINGS ARE INDICATIVE OF FLUEING OPTIONS ONLY TYPE 1 TYPE 5 TYPE 4 TYPE 3 TYPE 2 FIG 2 21...
Страница 68: ...68 10 BENCHMARK COMMISSIONING CHECKLIST...
Страница 69: ...69 11 SERVICE INTERVAL RECORD...
Страница 70: ...70...
Страница 71: ...71...