ARG - ABRAHAM REYNOLDS GROUP di Luciano De Pace & C. S.A.S.
Viale Paradiso 19 - I - 10040 RIVAROSSA - (TO) Tel . : +39-011-9700112 - Fax. : +39-011-9700112 E mail :
[email protected] Web: www.argweb.eu Web DYNAMO : www.dynamo-jet.it
BATTERY
DYNAMO has been provided for the insertion of batteries packs on the compartment where you installed the nose gear steering
servo.
In this compartment are easily placed:
No. 2 2220 2S 35C Lipo batteries to power the on-board electronics
No. 2 2220 2S 35C Lipo batteries to power the turbine
No. 1 1350 2S 35C Lipo batteries to power electric Landing gear
ELECTRICAL WIRING
For electrical wiring we recommend to purchase the kit pre-wired cables supplied by us, otherwise provided by your-self to make the
right wiring in according with the layout choose for the model.
For the cables of the elevators, rudder and wing servos, we suggest to use Bauden spring steel as a probe.
The electrical connections to the wings including any electric landing gear connections can be made using the MPX connectors with
their boxes to be screwed on root-rib after have draw and cut a proper seat, while the connection to the
Elevator can be made with glued with epoxy resin the connector as shown in the following images:
ELEVATOR
WING
BALANCING
On DYNAMO has been provided the opportunity to enter a counterweight variable depending on the type of turbine and system
adopted by the Customer. using the hole on the first Rib on the nose of the model that allows you to contain within about 500 grams
of lead weights.
Based on the tests performed with almost all the engines it was necessary to insert about 500 grams of lead weights to get a pre
balance to be refined after the assembly of all the accessories and battery power.
The best flight results on the basis of tests carried out have shown that the best position of the center of gravity (CG) is a 155,00 mm
measured from the leading edge of the wings to the fuselage at the point of joint.