5.3.2 Example
Setting
The following information was recorded by the relay during commissioning:
full load = 500A
I2 = 50A
therefore the quiescent ratio for I2/I1 is given by:
I2/I1 = 50/500 = 0.1
To allow for tolerances and load variations a setting of 200% of this value may be typical:
Therefore set RATIO I2/I1 = 20%
Set tBC = 60 s to allow adequate time for short circuit fault clearance by time delayed
protections.
5.4
Cold Load Pick-up (P126 & P127)
The Cold Load Pick-up feature enables the selected settings of the MiCOM P126 and P127
relays to be changed to react to temporary overload conditions that may occur during cold
starts.
This condition may occur by switching on large heating loads after a sufficient cooling period,
or loads that draw high initial starting currents.
When a feeder is energised, the current levels that flow for a period of time following
energising may differ greatly from the normal load levels. Consequently, overcurrent settings
that have been applied to give short circuit protection may not be suitable during this period.
The Cold Load Pick-up (CLP) logic included in the MiCOM P126 & P127 relays raises the
settings of selected stages for a set duration. This allows the protection settings to be set
closer to the load profile by automatically increasing them after energising. The CLP logic
provides stability, without compromising protection performance during starting.
Cold Load Pick-up (CLP) setting is described in the Technical Data (TD), the CLP menu in
the User Guide (FT).
The timer tCL in the CLP menu controls the time for which the relevant protections elements
in CLP menu (%) are altered following an external input signal (e.g. circuit breaker closure.
When the set tCL time has elapsed, all of the relevant settings revert back to their original
values or become unblocked.
tCL is initiated via a dedicated logic input signal (refer to AUTOMAT. CTRL/INPUTS menu),
generated by connecting an auxiliary contact from the circuit breaker (52a or 52b) or starting
device to the logic relevant inputs of the relay.
The following sections describe applications where the CLP logic may be useful and the
settings that need to be applied.
5.4.1
Air Conditioning / Resistive Heating Loads
Where a feeder is used to supply air conditioning or resistive heating loads there may be a
conflict between the "steady state" overcurrent settings and those required following
energizing. This is due to the temporary increase in load current that may arise during
starting.
With the Cold Load Pick-up function enabled, the affected thresholds are selected to be
adjusted for the required time to allow the start condition to subside. A percentage value is
selected as the amount by which the selected threshold is increased or decreased.
The time for which the adjusted thresholds are valid is defined by the tCL setting. After this
time, the settings return to normal.
It may not be necessary to alter the protection settings following a short supply interruption.
In this case the CLP function is not activated.
Содержание MiCOM P125
Страница 1: ...MiCOM P125 P126 P127 Directional Non directional Relay Technical Guide P12Y EN T E32...
Страница 2: ......
Страница 4: ...P12y EN T E32 Technical Guide Page 2 2 MiCOM P125 P126 P127 BLANK PAGE...
Страница 5: ...Pxxxx EN SS B11 SAFETY SECTION...
Страница 6: ......
Страница 8: ...Pxxxx EN SS B11 Page 2 10 Safety Section BLANK PAGE...
Страница 16: ...Pxxxx EN SS B11 Page 10 10 Safety Section BLANK PAGE...
Страница 17: ...Getting Started P12y EN GS D32 MiCOM P125 P126 P127 GETTING STARTED...
Страница 18: ......
Страница 66: ...P12y EN GS D32 Getting Started Page 48 48 MiCOM P125 P126 P127 BLANK PAGE...
Страница 68: ......
Страница 70: ...P12y EN IN C22 Handling Installation and Case Dimensions Page 2 10 MiCOM P125 P126 P127 BLANK PAGE...
Страница 78: ...P12y EN IN C22 Handling Installation and Case Dimensions Page 10 10 MiCOM P125 P126 P127 BLANK PAGE...
Страница 79: ...User Guide P12y EN FT D32 MiCOM P125 P126 P127 USER GUIDE...
Страница 80: ......
Страница 166: ...P12y EN FT D32 User Guide Page 86 86 MiCOM P125 P126 P127 BLANK PAGE...
Страница 167: ...Technical Data P12y EN TD D32 MiCOM P125 P126 P127 TECHNICAL DATA AND CHARACTERISTIC CURVES...
Страница 168: ......
Страница 197: ...Application Guide P12y EN AP D32 MiCOM P125 P126 P127 APPLICATION GUIDE...
Страница 198: ......
Страница 202: ...P12y EN AP D32 Application Guide Page 4 74 MiCOM P125 P126 P127 BLANK PAGE...
Страница 273: ...Commissioning and Maintenance P12y EN CM C22 MiCOM P125 P126 P127 COMMISSIONING AND MAINTENANCE GUIDE...
Страница 274: ......
Страница 298: ...P12y EN CM C22 Commissioning and Maintenance Page 24 24 MiCOM P125 P126 P127 BLANK PAGE...
Страница 299: ...Connections and Wiring Diagrams P12y EN CO C22 MiCOM P125 P126 P127 CONNECTIONS AND WIRING DIAGRAMS...
Страница 300: ......
Страница 302: ...P12y EN CO C22 Connections and Wiring Diagrams Page 2 10 MiCOM P125 P126 P127 BLANK PAGE...
Страница 310: ...P12y EN CO C22 Connections and Wiring Diagrams Page 10 10 MiCOM P125 P126 P127 BLANK PAGE...
Страница 311: ...Commissioning Test and Record Sheet P12y EN RS D32 MiCOM P125 P126 P127 COMMISSIONING TEST AND RECORD SHEET...
Страница 312: ......
Страница 360: ...P12y EN RS D32 Commissioning Test and Record Sheet Page 48 48 MiCOM P125 P126 P127 BLANK PAGE...
Страница 361: ......